Crossref
Optimal common manufacturing cycle length for a multi-product inventory system with rework and an outside contractor
International Journal for Engineering Modelling · 2019
DOI: 10.31534/engmod.2019.1.ri.01v ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal for Engineering Modelling, 2019.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
(2019). Optimal common manufacturing cycle length for a multi-product inventory system with rework and an outside contractor. International Journal for Engineering Modelling. https://doi.org/10.31534/engmod.2019.1.ri.01v
Vancouver
Optimal common manufacturing cycle length for a multi-product inventory system with rework and an outside contractor. International Journal for Engineering Modelling. 2019. doi:10.31534/engmod.2019.1.ri.01v
BibTeX
@article{euvimed2019,
title = {Optimal common manufacturing cycle length for a multi-product inventory system with rework and an outside contractor},
journal = {International Journal for Engineering Modelling},
year = {2019},
doi = {10.31534/engmod.2019.1.ri.01v}
}
EUVIMED