Crossref
Utilization of CIM in the Construction of Labyrinth Spillway in Sengozawa Dam
Concrete Journal · 2025 · 63 (7) · 545-550
DOI: 10.3151/coj.63.7_545 ↗Kurz gefasst
Fachartikel in der Zeitschrift Concrete Journal, 2025. Verfasst von F. Yamada und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Yamada, F., & Yamaguchi, H. (2025). Utilization of CIM in the Construction of Labyrinth Spillway in Sengozawa Dam. Concrete Journal, 63(7), 545-550. https://doi.org/10.3151/coj.63.7_545
Vancouver
Yamada F, Yamaguchi H. Utilization of CIM in the Construction of Labyrinth Spillway in Sengozawa Dam. Concrete Journal. 2025;63(7):545-550. doi:10.3151/coj.63.7_545
BibTeX
@article{Yamada2025,
author = {Yamada, F. and Yamaguchi, H.},
title = {Utilization of CIM in the Construction of Labyrinth Spillway in Sengozawa Dam},
journal = {Concrete Journal},
year = {2025},
volume = {63},
number = {7},
pages = {545--550},
doi = {10.3151/coj.63.7_545}
}
EUVIMED