Crossref
Sprayed Concrete Setting Acceleration Method to Reduce Standby Time until Concrete Surface Finishing
Concrete Journal · 2025 · 63 (6) · 470-476
DOI: 10.3151/coj.63.6_470 ↗Kurz gefasst
Fachartikel in der Zeitschrift Concrete Journal, 2025. Verfasst von G. Orita und 3 weiteren Autor:innen. Die Arbeit nennt 8 Literaturangaben.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Orita, G., Kaneko, Y., Makishima, O., & Hirama, A. (2025). Sprayed Concrete Setting Acceleration Method to Reduce Standby Time until Concrete Surface Finishing. Concrete Journal, 63(6), 470-476. https://doi.org/10.3151/coj.63.6_470
Vancouver
Orita G, Kaneko Y, Makishima O, Hirama A. Sprayed Concrete Setting Acceleration Method to Reduce Standby Time until Concrete Surface Finishing. Concrete Journal. 2025;63(6):470-476. doi:10.3151/coj.63.6_470
BibTeX
@article{Orita2025,
author = {Orita, G. and Kaneko, Y. and Makishima, O. and Hirama, A.},
title = {Sprayed Concrete Setting Acceleration Method to Reduce Standby Time until Concrete Surface Finishing},
journal = {Concrete Journal},
year = {2025},
volume = {63},
number = {6},
pages = {470--476},
doi = {10.3151/coj.63.6_470}
}
EUVIMED