A new bi-objective quality-based construction supply chain framework: From purchasing to commissioning
Journal of Construction Engineering, Management & Innovation · 30.06.2026 · 9 (2) · 677-1-677-24
DOI: 10.31462/jcemi.2026.677 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Construction Engineering, Management & Innovation, online erschienen am 30.06.2026. Verfasst von Maryam Izadbakhsh und 3 weiteren Autor:innen.
Abstract (Originalsprache)
Many construction organizations struggle with limited resources and tight budgets for project execution. These firms often rely on non-renewable resources of inconsistent quality or perform summary task in ways that reduce costs but sacrifice accuracy. Consequently, the industry requires a quality management system that tackles resource selection, task performance, and cost control in a single framework. Prior studies addressed quality management in segmented sections of the project supply chain but rarely treated the entire sequence as an integrated process. This study develops a bi-objective linear programming model for a multi-project construction supply chain under two scenarios: one with a discount policy applied to selected suppliers and one without. The model covers every phase, from project initiation and resource procurement through task scheduling and final delivery. It aims to improve the quality of summary task performance, select non-renewable resources that meet specified thresholds, and reduce overall logistics costs by jointly integrating supplier selection, inventory management, summary-task scheduling, shared renewable resources, and quality within a single framework. In this formulation, the quality metric for each summary task corresponds to the level of technology applied; higher‐quality outcomes require more advanced equipment or methods. The two‐objective model is solved via the augmented ε-constraint method, and its results are demonstrated with a numerical example. Sensitivity analysis examines how changes in cost coefficients and quality thresholds affect optimal decisions. Then, the applicability of the proposed model is illustrated through a numerical example, and its behavior is further examined by changing the key parameters. The results show that the proposed model reduces project delays and improves resource utilization by coordinating supplier selection, procurement timing, and summarytask scheduling within a unified decision-making framework. The analysis also identifies buying cost, ordering cost, inventory holding cost, and required non-renewable resources as the most influential parameters.
Zitieren
APA
Izadbakhsh, M., Ghannadpour, S. F., Bagherpour, M., & Mazdeh, M. M. (2026). A new bi-objective quality-based construction supply chain framework: From purchasing to commissioning. Journal of Construction Engineering, Management & Innovation, 9(2), 677-1-677-24. https://doi.org/10.31462/jcemi.2026.677
Vancouver
Izadbakhsh M, Ghannadpour SF, Bagherpour M, Mazdeh MM. A new bi-objective quality-based construction supply chain framework: From purchasing to commissioning. Journal of Construction Engineering, Management & Innovation. 2026;9(2):677-1-677-24. doi:10.31462/jcemi.2026.677
BibTeX
@article{Izadbakhsh2026,
author = {Izadbakhsh, Maryam and Ghannadpour, Seyed Farid and Bagherpour, Morteza and Mazdeh, Mohammad Mahdavi},
title = {A new bi-objective quality-based construction supply chain framework: From purchasing to commissioning},
journal = {Journal of Construction Engineering, Management & Innovation},
year = {2026},
volume = {9},
number = {2},
pages = {677--1--677--24},
doi = {10.31462/jcemi.2026.677}
}
EUVIMED