Penerapan Integrated Project Delivery untuk Mewujudkan Ruang Operasi yang Nyaman dan Sehat
JAUR (JOURNAL OF ARCHITECTURE AND URBANISM RESEARCH) · 01.05.2026 · 9 (2) · 632-642
DOI: 10.31289/jaur.v9i2.15787 ↗Kurz gefasst
Fachartikel in der Zeitschrift JAUR (JOURNAL OF ARCHITECTURE AND URBANISM RESEARCH), online erschienen am 01.05.2026. Verfasst von Muhammad Luthfan Nur Azmi und 1 weiteren Autor:innen. Die Arbeit nennt 15 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
This research analyzes the implementation of Integrated Project Delivery (IPD) methodology in hospital operating room construction to create a work environment that supports optimal health and comfort standards. The research method uses a qualitative approach by combining systematic literature review and case study analysis at JIH Purwokerto Hospital. Data analysis process was conducted through cross-verification techniques with thematic coding to identify effectiveness patterns of IPD implementation. Research results indicate that IPD implementation can optimize air ventilation systems through HVAC technology integration with H13-H14 HEPA filter standards, creating environmental parameter stability that supports medical activities. Strategic synergy between IPD and Building Information Modeling (BIM) produces effective cross-disciplinary coordination, eliminating communication barriers among project stakeholders. Implementation of Internet of Things (IoT) technology within the IPD framework provides significant contributions to medical data management efficiency and real-time operational environment quality monitoring. Economic aspect evaluation shows construction cost efficiency reaching 30% with substantial change order reduction. Despite facing contractual challenges in the Indonesian context, IPD implementation successfully creates a reference model for optimizing healthcare facility development with international standards.
Zitieren
APA
Azmi, M. L. N., & Mutaqi, A. S. (2026). Penerapan Integrated Project Delivery untuk Mewujudkan Ruang Operasi yang Nyaman dan Sehat. JAUR (JOURNAL OF ARCHITECTURE AND URBANISM RESEARCH), 9(2), 632-642. https://doi.org/10.31289/jaur.v9i2.15787
Vancouver
Azmi MLN, Mutaqi AS. Penerapan Integrated Project Delivery untuk Mewujudkan Ruang Operasi yang Nyaman dan Sehat. JAUR (JOURNAL OF ARCHITECTURE AND URBANISM RESEARCH). 2026;9(2):632-642. doi:10.31289/jaur.v9i2.15787
BibTeX
@article{Azmi2026,
author = {Azmi, Muhammad Luthfan Nur and Mutaqi, Ahmad Saifudin},
title = {Penerapan Integrated Project Delivery untuk Mewujudkan Ruang Operasi yang Nyaman dan Sehat},
journal = {JAUR (JOURNAL OF ARCHITECTURE AND URBANISM RESEARCH)},
year = {2026},
volume = {9},
number = {2},
pages = {632--642},
doi = {10.31289/jaur.v9i2.15787}
}
EUVIMED