Obstacles in Implementing Safety Management System in Nepalese Construction Projects
SCITECH Nepal · 28.04.2026 · 18 (1) · 43-51
DOI: 10.3126/scitech.v18i1.90814 ↗Kurz gefasst
Fachartikel in der Zeitschrift SCITECH Nepal, online erschienen am 28.04.2026. Verfasst von Basant Bhatta und 3 weiteren Autor:innen.
Abstract (Originalsprache)
The rapid growth of construction activities in Nepal has led to an increase in accidents and fatalities. Construction projects are inherently risky due to the use of heavy equipment, power tools, and involvement of workers from various backgrounds. Safety management systems (SMS) help to mitigate these risks and hazards, which are in early stages in Nepal. The main purpose of the study is to find out the major obstacles in implementing SMS in construction projects. A total of 368 completely filled responses were collected and Principal Component Analysis (PCA) was used for analysis. Twenty-two obstacles were identified through an extensive review of the literature which were divided into five components using PCA. It was found that poor safety culture explained the most variation, accounting for 38.890% of the overall variance, with an Eigen value of 8.556. This study concludes that SMS are an essential tool in managing safety in construction projects, but their implementation requires careful planning, training and resources which will further help to improve SMS practices in similar projects.
Zitieren
APA
Bhatta, B., Sukamani, D., Acharya, M., & Karki, S. (2026). Obstacles in Implementing Safety Management System in Nepalese Construction Projects. SCITECH Nepal, 18(1), 43-51. https://doi.org/10.3126/scitech.v18i1.90814
Vancouver
Bhatta B, Sukamani D, Acharya M, Karki S. Obstacles in Implementing Safety Management System in Nepalese Construction Projects. SCITECH Nepal. 2026;18(1):43-51. doi:10.3126/scitech.v18i1.90814
BibTeX
@article{Bhatta2026,
author = {Bhatta, Basant and Sukamani, Dinesh and Acharya, Mahendra and Karki, Shashanka},
title = {Obstacles in Implementing Safety Management System in Nepalese Construction Projects},
journal = {SCITECH Nepal},
year = {2026},
volume = {18},
number = {1},
pages = {43--51},
doi = {10.3126/scitech.v18i1.90814}
}
EUVIMED