Crossref
METHODOLOGICAL FRAMEWORK FOR THE ANALYSIS OF THE COST OF DELAYS IN THE CONSTRUCTION OF MOTORWAYS
Put i saobraćaj · 19.06.2026 · (6SKP) · 11
DOI: 10.31075/6skp.01 ↗Kurz gefasst
Fachartikel in der Zeitschrift Put i saobraćaj, online erschienen am 19.06.2026. Verfasst von Drazenko Glavic.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Glavic, D. (2026). METHODOLOGICAL FRAMEWORK FOR THE ANALYSIS OF THE COST OF DELAYS IN THE CONSTRUCTION OF MOTORWAYS. Put i saobraćaj, 11. https://doi.org/10.31075/6skp.01
Vancouver
Glavic D. METHODOLOGICAL FRAMEWORK FOR THE ANALYSIS OF THE COST OF DELAYS IN THE CONSTRUCTION OF MOTORWAYS. Put i saobraćaj. 2026:11. doi:10.31075/6skp.01
BibTeX
@article{Glavic2026,
author = {Glavic, Drazenko},
title = {METHODOLOGICAL FRAMEWORK FOR THE ANALYSIS OF THE COST OF DELAYS IN THE CONSTRUCTION OF MOTORWAYS},
journal = {Put i saobraćaj},
year = {2026},
number = {6SKP},
pages = {11},
doi = {10.31075/6skp.01}
}
EUVIMED