Workload Analysis to Determine Optimal Labor Need in the Production Division at UD. XYZ
Heuristic · 30.10.2026 · 253-268
DOI: 10.30996/heuristic.v23i2.133609 ↗Kurz gefasst
Fachartikel in der Zeitschrift Heuristic, online erschienen am 30.10.2026. Verfasst von Aulia Shiva Divana und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
The increasingly competitive manufacturing industry requires companies to manage the production process efficiently and optimally. This research aims to analyze workload and determine the optimal workforce needs at UD. XYZ, a wheeldop manufacturing company located in Sidoarjo, East Java. The main problem faced by the company is the repeated failure to achieve the 98% production target during the period from July 2025 to March 2026, with the realization only reaching 91%-95%. Data were collected through stopwatch time studies involving 20 worker across six worlstatoions. The observed time were proceses to determine cycle time, normal time using the Westinghouse Rating Factor method, and standard time by incorporating allowances. Furthermore, Workload Analysis (WLA) was applied to evaluate workforce adequacy based on actual workloads. The results indicate that the rolling workstation is overloaded, with a WLA value exceeding 1.0, while the other workstations fall within the normal to underloaded categories. To address this imbalance, two alternatives were evaluated: adding permanent workers and implementing an overtime system. Cost analysis revealed that the overtime system is more economical, with a monthly cost difference of IDR 9,360,000. The main contribution of this study lies in integrating workload assessment with a comparative cost analysis to identify a practical workforce adjustment strategy for wheel trim manufacturing. These findings provide an evidence-based recommendation for addressing workload imbalances, improving workforce utilization, and supporting the achievement of production targets.
Zitieren
APA
Divana, A. S., & Satoto, H. F. (2026). Workload Analysis to Determine Optimal Labor Need in the Production Division at UD. XYZ. Heuristic, 253-268. https://doi.org/10.30996/heuristic.v23i2.133609
Vancouver
Divana AS, Satoto HF. Workload Analysis to Determine Optimal Labor Need in the Production Division at UD. XYZ. Heuristic. 2026:253-268. doi:10.30996/heuristic.v23i2.133609
BibTeX
@article{Divana2026,
author = {Divana, Aulia Shiva and Satoto, Handy Febri},
title = {Workload Analysis to Determine Optimal Labor Need in the Production Division at UD. XYZ},
journal = {Heuristic},
year = {2026},
pages = {253--268},
doi = {10.30996/heuristic.v23i2.133609}
}
EUVIMED