Analysis of Project Acceleration Implementation Using the CPM and PERT at Lettu Imam Building

Heningtyas Rofi Hana, Hanie Teki Tjendani

EXTRAPOLASI · 2022

DOI: 10.30996/ep.v19i02.7656 ↗

Kurz gefasst

Fachartikel in der Zeitschrift EXTRAPOLASI, 2022. Verfasst von Heningtyas Rofi Hana und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The implementation of construction projects generally has a predetermined time limit. To achieve the time limit, planning and controlling are necessary. Planning can determine what work needs to be done and when it is done, what resources are needed, and what risks may arise. Clear activity targets can be identified for each activity. The case study in this research is Lettu Imam Building Construction Project in the OPD Office Complex of Pasuruan Regency. This study uses the Critical Path Method (CPM) to determine the work items passed through the critical path and the Project Evaluation and Review Technique (PERT) to determine the probability of project success. The results of the analysis using the Critical Path Method are 14 work items that were on the critical path A1 - A2 - A3 - B1 - C1 - C2 - C3 - C4 - C5 - C6 - C7 - C8 - C9 - D1. And the result analysis using Project Evaluation and Review Technique has a project completion probability of 89.43% - 99.37%, with the project implementation duration being 162 - 164 days. Keywords: Critical Path, Critical Path Method, Planning, Probability, Project Evaluation and Review Technique

Zitieren

APA

Hana, H. R., & Tjendani, H. T. (2022). Analysis of Project Acceleration Implementation Using the CPM and PERT at Lettu Imam Building. EXTRAPOLASI. https://doi.org/10.30996/ep.v19i02.7656

Vancouver

Hana HR, Tjendani HT. Analysis of Project Acceleration Implementation Using the CPM and PERT at Lettu Imam Building. EXTRAPOLASI. 2022. doi:10.30996/ep.v19i02.7656

BibTeX
@article{Hana2022,
  author = {Hana, Heningtyas Rofi and Tjendani, Hanie Teki},
  title = {Analysis of Project Acceleration Implementation Using the CPM and PERT at Lettu Imam Building},
  journal = {EXTRAPOLASI},
  year = {2022},
  doi = {10.30996/ep.v19i02.7656}
}
Kostenlos starten →