Application Of Crashing Method On Sutt Construction Project 150 Kv Kolaka - Pomalaa Switching - PT Antam Pomalaa Customer

Fatmawaty Rachim, Frans Ryanto Hasudungan Tampubolon, Herwina Rahayu Putri, Andi Butsainah Tumaadir

Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan · 17.09.2025 · 10 (2) · 133-140

DOI: 10.30736/cvl.v10i2.1443 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan, online erschienen am 17.09.2025. Verfasst von Fatmawaty Rachim und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Construction projects often experience delays that can result in a fine of 1/1000 of the contract value according to Presidential Regulation No. 54/2010. To overcome this, the crashing program method can be applied to accelerate the project duration by identifying and compressing the critical path. The case study on the 150 kV Kolaka - Pomalaa Switching - PT Antam Pomalaa SUTT Construction Project which experienced delays, analyzed the need for additional time, equipment and labor. With an initial contract duration of 300 calendar days, the implementation of the crashing program focused on four priority segments of work (TIP 40-54, TIP 01-11, TIP 23-40, and TIP 11-23). The results of the analysis showed that the application of the crashing program method successfully optimized the project completion duration to 263 days, allowing the project to return to the contract schedule and avoid potential fines.

Zitieren

APA

Rachim, F., Tampubolon, F. R. H., Putri, H. R., & Tumaadir, A. B. (2025). Application Of Crashing Method On Sutt Construction Project 150 Kv Kolaka - Pomalaa Switching - PT Antam Pomalaa Customer. Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan, 10(2), 133-140. https://doi.org/10.30736/cvl.v10i2.1443

Vancouver

Rachim F, Tampubolon FRH, Putri HR, Tumaadir AB. Application Of Crashing Method On Sutt Construction Project 150 Kv Kolaka - Pomalaa Switching - PT Antam Pomalaa Customer. Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan. 2025;10(2):133-140. doi:10.30736/cvl.v10i2.1443

BibTeX
@article{Rachim2025,
  author = {Rachim, Fatmawaty and Tampubolon, Frans Ryanto Hasudungan and Putri, Herwina Rahayu and Tumaadir, Andi Butsainah},
  title = {Application Of Crashing Method On Sutt Construction Project 150 Kv Kolaka - Pomalaa Switching - PT Antam Pomalaa Customer},
  journal = {Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan},
  year = {2025},
  volume = {10},
  number = {2},
  pages = {133--140},
  doi = {10.30736/cvl.v10i2.1443}
}
Kostenlos starten →