EUVIMEDEUVIMED entdecken
Crossref

Analisis Perbandingan Metode Rasional dan Nakayasu untuk Penentuan Kapasitas Sump Pit 19AS

Nadia Rahmavidy Gitarista, Tedy Agung Cahyadi, Reza Ferdyan, Edward Pernando

Jurnal Pendidikan, Sains, Geologi, dan Geofisika (GeoScienceEd Journal) · 10.04.2026 · 7 (2) · 870-880

DOI: 10.29303/goescienceed.v7i2.1785 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Pendidikan, Sains, Geologi, dan Geofisika (GeoScienceEd Journal), online erschienen am 10.04.2026. Verfasst von Nadia Rahmavidy Gitarista und 3 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

A well-designed drainage system is a fundamental component in planning new open-pit (greenfield) mining operations to ensure production continuity and operational safety from the outset. This study aims to compare the Rational and Nakayasu methods in a hydrological analysis to design the sump capacity of Pit 19AS, with a catchment area of 289 ha. The methodology includes rainfall frequency distribution analysis, runoff discharge estimation using both methods, and water balance simulation to determine sump capacity. The results show significant differences between the two approaches. The Rational method produces a static runoff estimate due to the assumption of uniform rainfall intensity, resulting in a sump volume of 168,773 m³. In contrast, the Nakayasu method more effectively represents flow dynamics by incorporating lag time and recession phases in the hydrograph, yielding a sump volume of 179,156 m³. Based on the water balance simulation, the Nakayasu method is recommended as a more reliable and representative approach for sump design in greenfield open-pit mining, particularly for large catchment areas such as the 289 ha case, as it complies with the mine drainage feasibility standards outlined in the Decree of the Minister of Energy and Mineral Resources No. 1827 K/30/MEM/2018.

Zitieren

APA

Gitarista, N. R., Cahyadi, T. A., Ferdyan, R., & Pernando, E. (2026). Analisis Perbandingan Metode Rasional dan Nakayasu untuk Penentuan Kapasitas Sump Pit 19AS. Jurnal Pendidikan, Sains, Geologi, dan Geofisika (GeoScienceEd Journal), 7(2), 870-880. https://doi.org/10.29303/goescienceed.v7i2.1785

Vancouver

Gitarista NR, Cahyadi TA, Ferdyan R, Pernando E. Analisis Perbandingan Metode Rasional dan Nakayasu untuk Penentuan Kapasitas Sump Pit 19AS. Jurnal Pendidikan, Sains, Geologi, dan Geofisika (GeoScienceEd Journal). 2026;7(2):870-880. doi:10.29303/goescienceed.v7i2.1785

BibTeX
@article{Gitarista2026,
  author = {Gitarista, Nadia Rahmavidy and Cahyadi, Tedy Agung and Ferdyan, Reza and Pernando, Edward},
  title = {Analisis Perbandingan Metode Rasional dan Nakayasu untuk Penentuan Kapasitas Sump Pit 19AS},
  journal = {Jurnal Pendidikan, Sains, Geologi, dan Geofisika (GeoScienceEd Journal)},
  year = {2026},
  volume = {7},
  number = {2},
  pages = {870--880},
  doi = {10.29303/goescienceed.v7i2.1785}
}
Kostenlos starten →