EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

FINANCIAL ANALYSIS OF 9-METER FIBERGLASS BOAT CONSTRUCTION AT CV. RONI MARINE SHIPYARD

Kinanti Dzakkiyah Az Zahra, Dwi Putra Yuwandana, Wazir Mawardi

ALBACORE Jurnal Penelitian Perikanan Laut · 28.06.2026 · 10 (2) · 199-212

DOI: 10.29244/core.10.2.199-212 ↗

Kurz gefasst

Fachartikel in der Zeitschrift ALBACORE Jurnal Penelitian Perikanan Laut, online erschienen am 28.06.2026. Verfasst von Kinanti Dzakkiyah Az Zahra und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Fiberglass Reinforced Plastics (FRP) boats are an alternative for fishing boats, providing durability, strength, and ease of production. This study aims to explain the production stages, material requirements, costs estimation, and business feasibility of constructing a 9-meter FRP boat at CV. Roni Marine Boatyard. The research was conducted through direct observation of the the boat construction process, interviews with boatyard staff, measurement of boat dimensions, and cost and financial analysis. The results show that production starts with preparation, fiberglass lamination, installation of wooden parts on the sheer, demolding, installation of internal frames and structural reinforcements, and final finishing. The estimated production cost of one boat unit is IDR 14,364,657. Financial analysis indicates an annual profit of IDR 218,120,568, with an R/C ratio of 1.25, B/C ratio of 1.253, IRR of 124%, a payback period of 0.80 years, and a break-even point of 48 units, demonstrating that the business is feasible and profitable. Key words: business feasibility, Cilacap, fiberglass, FRP boatyard, production cost

Zitieren

APA

Zahra, K. D. A., Yuwandana, D. P., & Mawardi, W. (2026). FINANCIAL ANALYSIS OF 9-METER FIBERGLASS BOAT CONSTRUCTION AT CV. RONI MARINE SHIPYARD. ALBACORE Jurnal Penelitian Perikanan Laut, 10(2), 199-212. https://doi.org/10.29244/core.10.2.199-212

Vancouver

Zahra KDA, Yuwandana DP, Mawardi W. FINANCIAL ANALYSIS OF 9-METER FIBERGLASS BOAT CONSTRUCTION AT CV. RONI MARINE SHIPYARD. ALBACORE Jurnal Penelitian Perikanan Laut. 2026;10(2):199-212. doi:10.29244/core.10.2.199-212

BibTeX
@article{Zahra2026,
  author = {Zahra, Kinanti Dzakkiyah Az and Yuwandana, Dwi Putra and Mawardi, Wazir},
  title = {FINANCIAL ANALYSIS OF 9-METER FIBERGLASS BOAT CONSTRUCTION AT CV. RONI MARINE SHIPYARD},
  journal = {ALBACORE Jurnal Penelitian Perikanan Laut},
  year = {2026},
  volume = {10},
  number = {2},
  pages = {199--212},
  doi = {10.29244/core.10.2.199-212}
}
Kostenlos starten →