EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-SA 4.0

Dump truck productivity enhancement through haul road geometry correction: a rimpull-based cycle time simulation

Dzaki Naufadhilah Ramadhan Efendi, Jukepsa Andas, Heri Prabowo, Syari Rahma Yanti

JRTI (Jurnal Riset Tindakan Indonesia) · 08.10.2026 · 11 (2) · 267-278

DOI: 10.29210/30037011000 ↗

Kurz gefasst

Fachartikel in der Zeitschrift JRTI (Jurnal Riset Tindakan Indonesia), online erschienen am 08.10.2026. Verfasst von Dzaki Naufadhilah Ramadhan Efendi und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study aimed to evaluate haul road geometry on the overburden route of Pit B at a coal mining contractor in Sarolangun, Jambi, Indonesia, and to estimate dump truck cycle time and productivity after geometry correction. An observational–evaluative field design was applied: 48 cross-sections of a 523.82 m road were surveyed with a Total Station and assessed against the Indonesian good mining practice decree, 30 truck trips were timed, and the corrected condition was simulated with a rimpull–resistance model. Only 18.75% of cross-sections met the study design criterion for two-lane width, the steepest descent reached −21.68% against a 12% limit, 45.8% met the cross-slope range on a two-side mean basis, and all curve radii complied. Delays caused by narrow and steep sections made up 69.2% of total delay. Correcting grade and width was predicted to reduce the cycle time from 11.99 to 9.47 minutes (21.0%; 95% bootstrap interval 20.1–21.9%) and to raise truck productivity from 32.06 to 40.60 bank cubic metres per hour (26.6%). If only half of the assumed speed gains were realised, the reduction would fall to 14.7%. These are simulation-based predictions that require field validation after road correction.

Zitieren

APA

Efendi, D. N. R., Andas, J., Prabowo, H., & Yanti, S. R. (2026). Dump truck productivity enhancement through haul road geometry correction: a rimpull-based cycle time simulation. JRTI (Jurnal Riset Tindakan Indonesia), 11(2), 267-278. https://doi.org/10.29210/30037011000

Vancouver

Efendi DNR, Andas J, Prabowo H, Yanti SR. Dump truck productivity enhancement through haul road geometry correction: a rimpull-based cycle time simulation. JRTI (Jurnal Riset Tindakan Indonesia). 2026;11(2):267-278. doi:10.29210/30037011000

BibTeX
@article{Efendi2026,
  author = {Efendi, Dzaki Naufadhilah Ramadhan and Andas, Jukepsa and Prabowo, Heri and Yanti, Syari Rahma},
  title = {Dump truck productivity enhancement through haul road geometry correction: a rimpull-based cycle time simulation},
  journal = {JRTI (Jurnal Riset Tindakan Indonesia)},
  year = {2026},
  volume = {11},
  number = {2},
  pages = {267--278},
  doi = {10.29210/30037011000}
}
Kostenlos starten →