EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

A Techno-Economic Framework for Natural Gas Pipeline Tariff Determination Under State Budget Financing: Evidence from The Semarang-Batang Open-Access Transmission Pipeline, Indonesia

Aji Agraning Bawono, Sutrasno Kartohardjono

Scientific Contributions Oil and Gas · 02.07.2026 · 49 (2) · 623-631

DOI: 10.29017/scog.v49i2.2117 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Scientific Contributions Oil and Gas, online erschienen am 02.07.2026. Verfasst von Aji Agraning Bawono und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Natural gas pipeline tariff regulation in Indonesia has historically been designed for investor-financed infrastructure, where tariffs must recover capital costs at a commercially determined weighted average cost of capital (WACC). The Semarang-Batang Transmission Pipeline (Cisem Phase I)—the first open-access transmission pipeline in Indonesia constructed under State Budget (APBN) financing—demands a fundamentally different tariff framework. This study develops and evaluates two alternative tariff formulation models tailored to government-funded infrastructure: (i) the State Capital Participation (PMN) scheme, which recovers capital at the government's retail sukuk coupon rate (IRR = 3.97%), and (ii) the State Property (BMN) scheme, which waives capital recovery entirely and charges only a management fee (CAPEX = 0). Results show that the BMN scheme delivers the lowest tariff of USD 0.279/MSCF, representing 55.7% below the conventional WACC-based tariff (USD 0.630/MSCF) and 25.0% below the PMN scheme (USD 0.372/MSCF). Sensitivity analysis confirms the BMN scheme's structural advantage: it eliminates IRR-driven tariff volatility and maximizes affordability for industrial end-users. These findings provide a replicable techno-economic framework and a practical policy basis for BPH Migas in determining transportation tariffs for APBN-financed pipeline infrastructure across Indonesia.

Zitieren

APA

Bawono, A. A., & Kartohardjono, S. (2026). A Techno-Economic Framework for Natural Gas Pipeline Tariff Determination Under State Budget Financing: Evidence from The Semarang-Batang Open-Access Transmission Pipeline, Indonesia. Scientific Contributions Oil and Gas, 49(2), 623-631. https://doi.org/10.29017/scog.v49i2.2117

Vancouver

Bawono AA, Kartohardjono S. A Techno-Economic Framework for Natural Gas Pipeline Tariff Determination Under State Budget Financing: Evidence from The Semarang-Batang Open-Access Transmission Pipeline, Indonesia. Scientific Contributions Oil and Gas. 2026;49(2):623-631. doi:10.29017/scog.v49i2.2117

BibTeX
@article{Bawono2026,
  author = {Bawono, Aji Agraning and Kartohardjono, Sutrasno},
  title = {A Techno-Economic Framework for Natural Gas Pipeline Tariff Determination Under State Budget Financing: Evidence from The Semarang-Batang Open-Access Transmission Pipeline, Indonesia},
  journal = {Scientific Contributions Oil and Gas},
  year = {2026},
  volume = {49},
  number = {2},
  pages = {623--631},
  doi = {10.29017/scog.v49i2.2117}
}
Kostenlos starten →