EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-SA 4.0

Implementation Analysis of Quality Control (QC) and Health, Safety, and Environment (HSE) Integration in The Pembangunan Bangunan Gedung dan Kawasan Kantor Kementerian Koordinator 4 IKN

Adinda Sillvy Septiani, Irwan Jodi, Putri Anggi Permata Suwandi, Agung Kristiawan

International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) · 14.11.2026 · 7 (2) · 53-57

DOI: 10.26877/ijosbie.v7i2.831 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE), online erschienen am 14.11.2026. Verfasst von Adinda Sillvy Septiani und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The construction of government office buildings in Indonesia’s New Capital City (IKN) involves complex activities that require effective quality management and occupational safety systems to ensure project success. In large-scale construction projects, deficiencies in quality control may lead to rework, delays, and increased costs, while inadequate safety management can result in workplace accidents and reduced productivity. Therefore, the integration of Quality Control (QC) and Health, Safety, and Environment (HSE) systems has become an important strategy for improving overall project performance. This study aims to analyze the implementation of integrated QC and HSE systems in the Construction of the Coordinating Ministry Office Complex Project (Kemenko 4) at IKN and evaluate their contribution to project performance improvement. The research employed a quantitative descriptive case-study approach using questionnaires, interviews, field observations, and project documentation reviews. Data were collected from project personnel, including project managers, QC engineers, HSE officers, supervisors, and construction workers, and analyzed using descriptive statistical methods. The results indicate that the implementation of integrated QC–HSE practices has been effectively carried out through joint inspections, integrated standard operating procedures, coordinated reporting systems, routine safety monitoring, and strong management commitment. The integration contributed to improved construction quality, reduced potential safety risks, enhanced communication and coordination among project stakeholders, increased workforce awareness, minimized duplication of activities, and improved operational efficiency. The study concludes that QC–HSE integration provides significant benefits in supporting project quality performance, occupational safety performance, and sustainable construction management, particularly in large-scale government infrastructure projects.

Zitieren

APA

Septiani, A. S., Jodi, I., Suwandi, P. A. P., & Kristiawan, A. (2026). Implementation Analysis of Quality Control (QC) and Health, Safety, and Environment (HSE) Integration in The Pembangunan Bangunan Gedung dan Kawasan Kantor Kementerian Koordinator 4 IKN. International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE), 7(2), 53-57. https://doi.org/10.26877/ijosbie.v7i2.831

Vancouver

Septiani AS, Jodi I, Suwandi PAP, Kristiawan A. Implementation Analysis of Quality Control (QC) and Health, Safety, and Environment (HSE) Integration in The Pembangunan Bangunan Gedung dan Kawasan Kantor Kementerian Koordinator 4 IKN. International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE). 2026;7(2):53-57. doi:10.26877/ijosbie.v7i2.831

BibTeX
@article{Septiani2026,
  author = {Septiani, Adinda Sillvy and Jodi, Irwan and Suwandi, Putri Anggi Permata and Kristiawan, Agung},
  title = {Implementation Analysis of Quality Control (QC) and Health, Safety, and Environment (HSE) Integration in The Pembangunan Bangunan Gedung dan Kawasan Kantor Kementerian Koordinator 4 IKN},
  journal = {International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)},
  year = {2026},
  volume = {7},
  number = {2},
  pages = {53--57},
  doi = {10.26877/ijosbie.v7i2.831}
}
Kostenlos starten →