EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-SA 4.0

Analysis of Flood Control Measures for the Dombo River in Sayung Based on a 50 year Return Period Flood Discharge

Neti Kurniawati, Adinda Ayu Dwi Lestari, Ikhwanudin, Farida Yudaningrum, Risdiana Cholifatul Afifah

International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE) · 14.11.2026 · 7 (2) · 27-33

DOI: 10.26877/ijosbie.v7i2.1184 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE), online erschienen am 14.11.2026. Verfasst von Neti Kurniawati und 4 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Dombo Sayung River in Demak Regency is one of the rivers prone to flooding due to increased flow discharge during the rainy season and the limited capacity of the river cross-section to accommodate water flow. This study aims to analyze the capacity of the Dombo Sayung River cross-sections under the 50-year return period flood discharge (Q50) of 78.96 m³/s using HEC-RAS 6.6 software. Hydrological analysis was conducted using the Nakayasu Synthetic Unit Hydrograph (SUH) method to determine the design flood discharge, while hydraulic analysis was carried out using a steady flow approach at several river cross-sections, namely STA 0, STA 29, and STA 60 (Dam 60). The simulation results indicate that at STA 0, the water surface elevation increased significantly but remained within the river cross-section capacity, indicating relatively safe conditions. At STA 29, the water level approached the riverbank elevation, indicating a critical condition with a high potential for overflow due to additional discharge caused by extreme rainfall or river sedimentation. Meanwhile, at STA 60 (Dam 60), the river cross-section was still relatively capable of accommodating the 50-year return period flood discharge, although an increase in water level was observed during the simulation. Based on these findings, flood control measures such as river normalization, sediment dredging, embankment elevation improvement, and routine river maintenance are required to enhance flow capacity and reduce flood risk in the Dombo Sayung River area.

Zitieren

APA

Kurniawati, N., Lestari, A. A. D., Ikhwanudin, Yudaningrum, F., & Afifah, R. C. (2026). Analysis of Flood Control Measures for the Dombo River in Sayung Based on a 50 year Return Period Flood Discharge. International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE), 7(2), 27-33. https://doi.org/10.26877/ijosbie.v7i2.1184

Vancouver

Kurniawati N, Lestari AAD, Ikhwanudin, Yudaningrum F, Afifah RC. Analysis of Flood Control Measures for the Dombo River in Sayung Based on a 50 year Return Period Flood Discharge. International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE). 2026;7(2):27-33. doi:10.26877/ijosbie.v7i2.1184

BibTeX
@article{Kurniawati2026,
  author = {Kurniawati, Neti and Lestari, Adinda Ayu Dwi and Ikhwanudin and Yudaningrum, Farida and Afifah, Risdiana Cholifatul},
  title = {Analysis of Flood Control Measures for the Dombo River in Sayung Based on a 50 year Return Period Flood Discharge},
  journal = {International Journal of Sustainable Building, Infrastructure and Environment (IJOSBIE)},
  year = {2026},
  volume = {7},
  number = {2},
  pages = {27--33},
  doi = {10.26877/ijosbie.v7i2.1184}
}
Kostenlos starten →