Crossref
Selection of the most Suitable Site for Dam Construction in Pishdar (AHP). District Using the Analytical Pyramid Process (AHP)
Journal of Raparin University · 2026 · 13 (1)
DOI: 10.26750/d483qr98 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Raparin University, 2026. Verfasst von Unknown Author.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Author, U. (2026). Selection of the most Suitable Site for Dam Construction in Pishdar (AHP). District Using the Analytical Pyramid Process (AHP). Journal of Raparin University, 13(1). https://doi.org/10.26750/d483qr98
Vancouver
Author U. Selection of the most Suitable Site for Dam Construction in Pishdar (AHP). District Using the Analytical Pyramid Process (AHP). Journal of Raparin University. 2026;13(1). doi:10.26750/d483qr98
BibTeX
@article{Author2026,
author = {Author, Unknown},
title = {Selection of the most Suitable Site for Dam Construction in Pishdar (AHP). District Using the Analytical Pyramid Process (AHP)},
journal = {Journal of Raparin University},
year = {2026},
volume = {13},
number = {1},
doi = {10.26750/d483qr98}
}
EUVIMED