Crossref
Task Block in a Multistage Flowshop Scheduling Problem Under Uncertainty Reduces the Waiting Time of Tasks
Communications in Mathematics and Applications · 30.03.2026 · 17 (1) · 25-36
DOI: 10.26713/cma.v17i1.3554 ↗Kurz gefasst
Fachartikel in der Zeitschrift Communications in Mathematics and Applications, online erschienen am 30.03.2026. Verfasst von Malvika Sharma und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Kein Abstract verfügbar.
Zitieren
APA
Sharma, M., & Gupta, D. (2026). Task Block in a Multistage Flowshop Scheduling Problem Under Uncertainty Reduces the Waiting Time of Tasks. Communications in Mathematics and Applications, 17(1), 25-36. https://doi.org/10.26713/cma.v17i1.3554
Vancouver
Sharma M, Gupta D. Task Block in a Multistage Flowshop Scheduling Problem Under Uncertainty Reduces the Waiting Time of Tasks. Communications in Mathematics and Applications. 2026;17(1):25-36. doi:10.26713/cma.v17i1.3554
BibTeX
@article{Sharma2026,
author = {Sharma, Malvika and Gupta, Deepak},
title = {Task Block in a Multistage Flowshop Scheduling Problem Under Uncertainty Reduces the Waiting Time of Tasks},
journal = {Communications in Mathematics and Applications},
year = {2026},
volume = {17},
number = {1},
pages = {25--36},
doi = {10.26713/cma.v17i1.3554}
}
EUVIMED