EUVIMEDEUVIMED entdecken
Crossref

Key points of subway construction technology under complicated geological conditions

Tian Nai

Journal of World Architecture · 1970

DOI: 10.26689/jwa.v1i1.44 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of World Architecture, 1970. Verfasst von Tian Nai.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Abstract: With the development of urban and rural construction speed, in the subway project construction, regardless of its construction management,or its corresponding construction technology, have a wide range of applications, in which the complex geological conditions of subway construction technology management is one of them.Application is more important and more difficult to control one of the key. However, due to the current construction of the subway project construction technology management, there are still some lack of mature technology problems, which makes the subway construction technology in complex geological conditions in the management of the application process, there are still a variety of problems, including construction safety and construction quality, and thus also seriously affect the social stability and development. This paper analyzes and discusses the main points of subway construction technology under complex geological conditions.

Zitieren

APA

Nai, T. (1970). Key points of subway construction technology under complicated geological conditions. Journal of World Architecture. https://doi.org/10.26689/jwa.v1i1.44

Vancouver

Nai T. Key points of subway construction technology under complicated geological conditions. Journal of World Architecture. 1970. doi:10.26689/jwa.v1i1.44

BibTeX
@article{Nai1970,
  author = {Nai, Tian},
  title = {Key points of subway construction technology under complicated geological conditions},
  journal = {Journal of World Architecture},
  year = {1970},
  doi = {10.26689/jwa.v1i1.44}
}
Kostenlos starten →