Interval network analysis in project management
Kongunadu Research Journal · 2020
DOI: 10.26524/krj.2020.29 ↗Kurz gefasst
Fachartikel in der Zeitschrift Kongunadu Research Journal, 2020. Verfasst von Radhakrishnan S und 1 weiteren Autor:innen. Die Arbeit wurde bisher 1-mal zitiert (Crossref).
Abstract (Originalsprache)
This paper deals with an analysis of Critical Path Method (CPM) and Programme Evaluation Review Technique (PERT) in Project Network. Here, we solve the PERT and CPM methodology using intervals and we determine the critical path and project duration of the network. We can also convert the fuzzy parameters (triangular and trapezoidal fuzzy numbers) into intervals using α − cuts. After which, we calculate the project duration and critical path. To illustrate this, numerical examples are provided.
Zitieren
APA
S, R., & D, S. (2020). Interval network analysis in project management. Kongunadu Research Journal. https://doi.org/10.26524/krj.2020.29
Vancouver
S R, D S. Interval network analysis in project management. Kongunadu Research Journal. 2020. doi:10.26524/krj.2020.29
BibTeX
@article{S2020,
author = {S, Radhakrishnan and D, Saikeerthana},
title = {Interval network analysis in project management},
journal = {Kongunadu Research Journal},
year = {2020},
doi = {10.26524/krj.2020.29}
}
EUVIMED