Stakeholder Engagement and Contract Planning Effectiveness: Impact on Project Performance of Transmission Company of Nigeria (TCN)
AFRICAN JOURNAL OF APPLIED RESEARCH · 11.07.2026 · 12 (4) · 405-422
DOI: 10.26437/ajnaqq78 ↗Kurz gefasst
Fachartikel in der Zeitschrift AFRICAN JOURNAL OF APPLIED RESEARCH, online erschienen am 11.07.2026. Verfasst von E. C. Ibrahim und 1 weiteren Autor:innen. Die Arbeit nennt 29 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).
Abstract (Originalsprache)
Purpose
This study seeks to appraise stakeholders’ engagement using three TCN projects in Lagos, Nigeria. The study’s objectives are to assess the level of engagement of stakeholders; the frequency of their involvement; the culture of TCN projects; usage of contract planning procedures; and performance in TCN projects. Design/Methodology/Approach: A survey research strategy was adopted for the study. The population of the study comprised construction professionals (electrical engineers, civil engineers, builders, architects, and quantity surveyors) and electricity consumers. Purposive sampling was used to select a sample size of 50 for each respondent category in the study, while a questionnaire was used for data collection. Data were gathered and analysed from the case projects selected. Frequency, percentages, mean score and mode were used to analyse the data. Research Limitation: The study is confined to three specific TCN projects in Lagos, Nigeria.
Findings
The findings revealed that local residents are well engaged in TCN projects; also, several contract planning procedures are employed in TCN projects, but the most used is project definition; while the overall performance of TCN projects is good Practical Implication: Stakeholders are well engaged in TCN projects. This implies that TCN projects are likely to experience fewer disruptions from communities, thereby improving project delivery. Social Implication: Greater emphasis should be placed on engaging stakeholders in TCN projects, which could strengthen stakeholder consultations throughout TCN project development and operations, starting from the planning phase. Originality / Value: The study advances theoretical and practical understanding of pre-construction planning processes by establishing a clearer link between objective setting and implementation readiness.
Zitieren
APA
Ibrahim, E. C., & Oladiran, O. J. (2026). Stakeholder Engagement and Contract Planning Effectiveness: Impact on Project Performance of Transmission Company of Nigeria (TCN). AFRICAN JOURNAL OF APPLIED RESEARCH, 12(4), 405-422. https://doi.org/10.26437/ajnaqq78
Vancouver
Ibrahim EC, Oladiran OJ. Stakeholder Engagement and Contract Planning Effectiveness: Impact on Project Performance of Transmission Company of Nigeria (TCN). AFRICAN JOURNAL OF APPLIED RESEARCH. 2026;12(4):405-422. doi:10.26437/ajnaqq78
BibTeX
@article{Ibrahim2026,
author = {Ibrahim, E. C. and Oladiran, O. J.},
title = {Stakeholder Engagement and Contract Planning Effectiveness: Impact on Project Performance of Transmission Company of Nigeria (TCN)},
journal = {AFRICAN JOURNAL OF APPLIED RESEARCH},
year = {2026},
volume = {12},
number = {4},
pages = {405--422},
doi = {10.26437/ajnaqq78}
}
EUVIMED