From Accident Causes to Risk Priorities: A Stakeholder-Based Statistical Framework for Construction Safety in India
International Journal of Scientific Research · 10.08.2025 · 5 (2) · 48-61
DOI: 10.25299/ijsr.2025.30134 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Scientific Research, online erschienen am 10.08.2025. Verfasst von SIVAPIRAN N und 1 weiteren Autor:innen.
Abstract (Originalsprache)
Construction safety is a multidimensional management problem in which technical hazards interact with human, ergonomic, planning, physical, organisational and supervisory conditions. This study develops and empirically examines a stakeholder-based framework that integrates accident-cause classification, Risk Rating (RR), Failure Mode and Effects Analysis (FMEA) - based Risk Priority Number (RPN), and statistical comparison of stakeholder perceptions. A structured cross-sectional survey of 1,250 construction professionals in India was undertaken, comprising 250 architects, 250 design engineers, 250 site engineers, 250 site supervisors and 250 construction workers. Twenty-three accident causes were organised into five domains—ergonomic, planning, physical, person and management activities—and evaluated against eight accident-risk categories. The overall RR ranking placed slips/trips/falls first (14.77), followed by struck by objects (14.23), falling from height (13.00), caught in between (12.17), collapses/cave-ins (9.60), faulty tools (7.95), electrocution (6.23), and fire/explosions (3.75). Stakeholder-specific RPN profiles and cause-wise statistical tests indicated substantial differences for many cause–risk combinations, while a small number of combinations showed non-significant differences. The findings demonstrate that construction risk cannot be understood adequately from a single stakeholder or a single risk score. This study contributes an integrated decision-support framework that connects cause identification, stakeholder perception, risk prioritisation, statistical evidence and targeted controls, with particular relevance to the Indian construction context.
Zitieren
APA
N, S., & G, M. (2025). From Accident Causes to Risk Priorities: A Stakeholder-Based Statistical Framework for Construction Safety in India. International Journal of Scientific Research, 5(2), 48-61. https://doi.org/10.25299/ijsr.2025.30134
Vancouver
N S, G M. From Accident Causes to Risk Priorities: A Stakeholder-Based Statistical Framework for Construction Safety in India. International Journal of Scientific Research. 2025;5(2):48-61. doi:10.25299/ijsr.2025.30134
BibTeX
@article{N2025,
author = {N, SIVAPIRAN and G, MURUGESAN},
title = {From Accident Causes to Risk Priorities: A Stakeholder-Based Statistical Framework for Construction Safety in India},
journal = {International Journal of Scientific Research},
year = {2025},
volume = {5},
number = {2},
pages = {48--61},
doi = {10.25299/ijsr.2025.30134}
}
EUVIMED