Utilizing Lean Six Sigma Model for Managing Projects in the Oil and Gas Pipeline Industry: A Case Study of Selected Companies in the Eastern Region, Saudi Arabia

Yosef Mohammed Hassan, Aiman Al- Odaini, Ali Mohamed Emmaima, Dr. Syafiqa Binti Ayob

International Journal of Drug Delivery Technology · 23.04.2026 · 16 (17s)

DOI: 10.25258/ijddt.16.17s.10 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal of Drug Delivery Technology, online erschienen am 23.04.2026. Verfasst von Yosef Mohammed Hassan und 3 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The use of Lean Six Sigma techniques in oil and gas pipeline projects in the Eastern Region of Saudi Arabia was evaluated to improve project performance with increased quality outcomes. These advanced methodologies were assessed to improve time management and cost control. The only sources of qualitative secondary data included in the study were case studies to project reports industry evaluations. This study shed light on how complex operations to traditional project management techniques with uneven quality control procedures were previously the main causes of inefficiencies and cost overruns in pipeline projects in the area. Research showed that the three areas where Lean Six Sigma concepts had the most influence on performance improvement were data-driven quality control to process standardisation. It was also included in waste reduction. Some stages were included. These approaches were international engineering to procurement and construction businesses that implemented training programs and mapped out their processes. These made good use of technologies like process mapping and root cause analysis and their results improved. Local companies have to overcome these challenges. These issues were met by many local businesses. Comparison studies have shown that Lean Six Sigma enhanced cost discipline, reduced the number of building mistakes, increased safety, and reduced the amount of rework that was required. Despite the fact that the research came to the conclusion that Lean Six Sigma had a great potential for improving pipeline project delivery results, it also pointed out that a successful implementation needed support from the top down, buy-in from staff members, and strategic alignment. Lean Six Sigma may potentially improve industry-wide competitiveness, operational consistency, and long-term sustainability, as stated in the research. This might be accomplished by incorporating the methodology into planned pipeline efforts.

Zitieren

APA

Hassan, Y. M., Odaini, A. A., Emmaima, A. M., & Ayob, D. S. B. (2026). Utilizing Lean Six Sigma Model for Managing Projects in the Oil and Gas Pipeline Industry: A Case Study of Selected Companies in the Eastern Region, Saudi Arabia. International Journal of Drug Delivery Technology, 16(17s). https://doi.org/10.25258/ijddt.16.17s.10

Vancouver

Hassan YM, Odaini AA, Emmaima AM, Ayob DSB. Utilizing Lean Six Sigma Model for Managing Projects in the Oil and Gas Pipeline Industry: A Case Study of Selected Companies in the Eastern Region, Saudi Arabia. International Journal of Drug Delivery Technology. 2026;16(17s). doi:10.25258/ijddt.16.17s.10

BibTeX
@article{Hassan2026,
  author = {Hassan, Yosef Mohammed and Odaini, Aiman Al- and Emmaima, Ali Mohamed and Ayob, Dr. Syafiqa Binti},
  title = {Utilizing Lean Six Sigma Model for Managing Projects in the Oil and Gas Pipeline Industry: A Case Study of Selected Companies in the Eastern Region, Saudi Arabia},
  journal = {International Journal of Drug Delivery Technology},
  year = {2026},
  volume = {16},
  number = {17s},
  doi = {10.25258/ijddt.16.17s.10}
}
Kostenlos starten →