Pigging Operation on a Propylene Transfer Pipeline
Jurnal Praktik Keinsinyuran · 12.11.2025 · 2 (05) · 497-503
DOI: 10.25170/jpk.v2i05.6961 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Praktik Keinsinyuran, online erschienen am 12.11.2025. Verfasst von Apriadi Bunga und 1 weiteren Autor:innen.
Abstract (Originalsprache)
In oil and Gas, pipelines are commonly used to transport hydrocarbons or products inland due to their efficiency and safety. It can operate 24 hours, 7 days without interruption, which is crucial for a continuous operation. Compared with trucking or rail transport, pipelines have lower operating and maintenance costs for bulk transportation. And as most pipelines will go underground, it provides safer operation by minimizing interaction with the public. Building a pipeline infrastructure requires a comprehensive process of planning, designing, procurement, construction up to the commissioning. One of the critical steps of the pipeline construction is conducting pigging, which can ensure cleanliness, dryness, and verify the pipe gauge and thickness. This will ensure safe operation of a pipeline. This article presents a case study of the pigging operation in a pipeline for propylene transfer stretch for approximately 4.1 km.
Zitieren
APA
Bunga, A., & Yanto (2025). Pigging Operation on a Propylene Transfer Pipeline. Jurnal Praktik Keinsinyuran, 2(05), 497-503. https://doi.org/10.25170/jpk.v2i05.6961
Vancouver
Bunga A, Yanto. Pigging Operation on a Propylene Transfer Pipeline. Jurnal Praktik Keinsinyuran. 2025;2(05):497-503. doi:10.25170/jpk.v2i05.6961
BibTeX
@article{Bunga2025,
author = {Bunga, Apriadi and Yanto},
title = {Pigging Operation on a Propylene Transfer Pipeline},
journal = {Jurnal Praktik Keinsinyuran},
year = {2025},
volume = {2},
number = {05},
pages = {497--503},
doi = {10.25170/jpk.v2i05.6961}
}
EUVIMED