Penerapan RBI dalam Perencanaan Inspeksi dan Mitigasi Peralatan Statis PT. PHO
Jurnal Praktik Keinsinyuran · 04.09.2025 · 2 (03) · 203-208
DOI: 10.25170/jpk.v2i03.6291 ↗Kurz gefasst
Fachartikel in der Zeitschrift Jurnal Praktik Keinsinyuran, online erschienen am 04.09.2025. Verfasst von Abror Aryowiweko und 2 weiteren Autor:innen.
Abstract (Originalsprache)
This study examines the implementation of the Risk-Based Inspection (RBI) methodology to provide a systematic approach to the inspection and mitigation of static equipment in the oil industry. Based on the API 581 standard edition 2020, risk evaluation is conducted through the calculation of the Probability of Failure (PoF) and Consequence of Failure (CoF), with the results visualized in a risk matrix. The research findings indicate that RBI facilitates more targeted and data-driven inspection planning compared to conventional approaches. Furthermore, this methodology allows for the establishment of a measurable timeline for implementing mitigation recommendations, thereby promoting efficient resource allocation, optimizing operational safety, and preventing equipment failures for operational sustainability.
Zitieren
APA
Aryowiweko, A., Pandjaitan, M. L. W., & Lukas (2025). Penerapan RBI dalam Perencanaan Inspeksi dan Mitigasi Peralatan Statis PT. PHO. Jurnal Praktik Keinsinyuran, 2(03), 203-208. https://doi.org/10.25170/jpk.v2i03.6291
Vancouver
Aryowiweko A, Pandjaitan MLW, Lukas. Penerapan RBI dalam Perencanaan Inspeksi dan Mitigasi Peralatan Statis PT. PHO. Jurnal Praktik Keinsinyuran. 2025;2(03):203-208. doi:10.25170/jpk.v2i03.6291
BibTeX
@article{Aryowiweko2025,
author = {Aryowiweko, Abror and Pandjaitan, M.M. Lanny W. and Lukas},
title = {Penerapan RBI dalam Perencanaan Inspeksi dan Mitigasi Peralatan Statis PT. PHO},
journal = {Jurnal Praktik Keinsinyuran},
year = {2025},
volume = {2},
number = {03},
pages = {203--208},
doi = {10.25170/jpk.v2i03.6291}
}
EUVIMED