EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

Analisis Evaluasi Kinerja Simpang Bersinyal Jl. Raya Nginden - Jl. Raya Panjang Jiwo Menggunakan PKJI 2014

Eko Adi Prayitno, Zainal Abidin, Miftachul Huda

Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil · 2019

DOI: 10.25139/jprs.v2i1.1491 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil, 2019. Verfasst von Eko Adi Prayitno und 2 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Jl. Raya Nginden - Jl. Raya Panjang Jiwo intersection is an intersection that has a high density level, especially at peak hour, it can be seen from the length of the queue. The aim of this study is to determine the intersection performance in existing conditions and the next 5 (five) years and give a recommendation for improving an intersection performance. For analyzing intersection traffic performance using Indonesian Road Capacity Guidelines method (PKJI 2014). Primary data in this study are traffic volume, intersection geometric conditions, and cycle times. While secondary data in this study are population data, vehicle growth data, and traffic data from CCTV. Data retrieval in one day of weekday and one day of weekend. The results show that the degree of saturation (DJ) of existing (in 2018) on Wednesday, North approach is 1.45, South 1.35, West 0.76, East 1.49 and existing DJ on Sunday approaching North 0.80, South 0.88, West 0.69 and East 1.12. For traffic performance in the next five years (in 2023) with existing cycle and phase times, DJ on Wednesday, North approach is 2.36, South 2.20, West 1.24, East 2.43 and DJ values on Sunday, North approach is 1.30, South 1.42, West 0.95 and East 1.81. For traffic performance improving at the intersection is made an alternative with changing the cycle time and movement phase which show the results in existing DJ (2018) on Wednesday for North approach is 0.86, South 0.92, West 0.77, East 0.43 and DJ on Sunday for North approach is 0.52 , South 0.67, West 0.52 and East 0.28. For the next five years' traffic performance (in 2023), DJ on Wednesday for North approach is 1.45, South 1.67, West 1.35, East 0.91 and existing DJ on Sunday for North approach is 0.88, South 1.22, West 0.92 and East 0.60.

Zitieren

APA

Prayitno, E. A., Abidin, Z., & Huda, M. (2019). Analisis Evaluasi Kinerja Simpang Bersinyal Jl. Raya Nginden - Jl. Raya Panjang Jiwo Menggunakan PKJI 2014. Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil. https://doi.org/10.25139/jprs.v2i1.1491

Vancouver

Prayitno EA, Abidin Z, Huda M. Analisis Evaluasi Kinerja Simpang Bersinyal Jl. Raya Nginden - Jl. Raya Panjang Jiwo Menggunakan PKJI 2014. Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil. 2019. doi:10.25139/jprs.v2i1.1491

BibTeX
@article{Prayitno2019,
  author = {Prayitno, Eko Adi and Abidin, Zainal and Huda, Miftachul},
  title = {Analisis Evaluasi Kinerja Simpang Bersinyal Jl. Raya Nginden - Jl. Raya Panjang Jiwo Menggunakan PKJI 2014},
  journal = {Ge-STRAM: Jurnal Perencanaan dan Rekayasa Sipil},
  year = {2019},
  doi = {10.25139/jprs.v2i1.1491}
}
Kostenlos starten →