ANALIZA TROŠKOVA IZGRADNJE OBJEKATA SA MONTAŽNOM AB KONSTRUKCIJOM
Zbornik radova Fakulteta tehničkih nauka u Novom Sadu · 23.08.2026 · 41 (01)
DOI: 10.24867/33cg02mucic ↗Kurz gefasst
Fachartikel in der Zeitschrift Zbornik radova Fakulteta tehničkih nauka u Novom Sadu, online erschienen am 23.08.2026. Verfasst von Mihailo Mucić.
Abstract (Originalsprache)
This paper includes an analysis and comparison of the construction costs of three completed industrial buildings with prefabricated RC structures. The buildings are located in Valjevo, Belgrade, and a suburban area, and differ in purpose, size, level of technical equipment, and finishing standards. The comparison is based on costs categorized by work types (civil, electrical, mechanical), as well as cost per unit of gross floor area. Special attention is given to the impact of the structural system on total costs and construction timeline.
Zitieren
APA
Mucić, M. (2026). ANALIZA TROŠKOVA IZGRADNJE OBJEKATA SA MONTAŽNOM AB KONSTRUKCIJOM. Zbornik radova Fakulteta tehničkih nauka u Novom Sadu, 41(01). https://doi.org/10.24867/33cg02mucic
Vancouver
Mucić M. ANALIZA TROŠKOVA IZGRADNJE OBJEKATA SA MONTAŽNOM AB KONSTRUKCIJOM. Zbornik radova Fakulteta tehničkih nauka u Novom Sadu. 2026;41(01). doi:10.24867/33cg02mucic
BibTeX
@article{Muci2026,
author = {Mucić, Mihailo},
title = {ANALIZA TROŠKOVA IZGRADNJE OBJEKATA SA MONTAŽNOM AB KONSTRUKCIJOM},
journal = {Zbornik radova Fakulteta tehničkih nauka u Novom Sadu},
year = {2026},
volume = {41},
number = {01},
doi = {10.24867/33cg02mucic}
}
EUVIMED