Evaluasi Biaya dan Waktu dengan Pendekatan Earned Value (Studi Kasus: Rekonstruksi Jalan Tenirung-SMA Seribu Bukit Gayo Lues)

Ir. Febriyanti Maulina, ST., MT

Journal of The Civil Engineering Student · 23.07.2026 · 8 (2)

DOI: 10.24815/ces.v8i2.2728 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of The Civil Engineering Student, online erschienen am 23.07.2026. Verfasst von Ir. Febriyanti Maulina und 2 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Planning and control are essential elements in the execution of construction projects to ensure success. One method used to monitor project progress is the Earned Value concept, which involves three key indicators: planned costs, actual costs, and realized costs. This study aims to identify cost (Cost Variance or CV) and schedule (Schedule Variance or SV) deviations and evaluate performance through the Cost Performance Index (CPI) and Schedule Performance Index (SPI). The Earned Value concept calculates costs based on the work that has been completed. The analysis shows that SV values were negative from weeks 1 to 11, indicating schedule delays. However, starting in week 12, the SV values became positive, recovering the delays. CV remained positive from weeks 1 to 26, reflecting cost efficiency. A CPI >1 throughout the analysis period indicates cost savings, although an SPI 1 sepanjang periode analisis menandakan penghematan biaya, meskipun SPI

Zitieren

APA

Maulina, I. F., ST., & MT (2026). Evaluasi Biaya dan Waktu dengan Pendekatan Earned Value (Studi Kasus: Rekonstruksi Jalan Tenirung-SMA Seribu Bukit Gayo Lues). Journal of The Civil Engineering Student, 8(2). https://doi.org/10.24815/ces.v8i2.2728

Vancouver

Maulina IF, ST., MT. Evaluasi Biaya dan Waktu dengan Pendekatan Earned Value (Studi Kasus: Rekonstruksi Jalan Tenirung-SMA Seribu Bukit Gayo Lues). Journal of The Civil Engineering Student. 2026;8(2). doi:10.24815/ces.v8i2.2728

BibTeX
@article{Maulina2026,
  author = {Maulina, Ir. Febriyanti and ST. and MT},
  title = {Evaluasi Biaya dan Waktu dengan Pendekatan Earned Value (Studi Kasus: Rekonstruksi Jalan Tenirung-SMA Seribu Bukit Gayo Lues)},
  journal = {Journal of The Civil Engineering Student},
  year = {2026},
  volume = {8},
  number = {2},
  doi = {10.24815/ces.v8i2.2728}
}
Kostenlos starten →