Analisis Analisis Tarif Trans Koetaradja Berdasarkan Pendekatan BOK Study Kasus Koridor 3B (Pusat Kota – Lhong Raya – Mata Ie)
Journal of The Civil Engineering Student · 01.07.2026 · 8 (2)
DOI: 10.24815/ces.v8i2.2412 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of The Civil Engineering Student, online erschienen am 01.07.2026. Verfasst von Ruhdi Faisal und 2 weiteren Autor:innen.
Abstract (Originalsprache)
The Special Autonomy Fund (OTSUS) in Aceh province will expire in 2026 based on information from the Aceh Province Regional Development Planning Agency (BAPPEDA), one of the facilities and infrastructure funded by OTSUS is the operation of the Trans Koetaradja Bus Corridor 3B, for the bus fare from the Aceh Transportation Service is still freeing every passenger who takes the bus. The purpose of this study was to determine an effective fare based on vehicle operating costs and to calculate the financial feasibility of the Trans Koetaradja Bus corridor 3B (City Center - Lhong Raya - Mata Ie). This research consists of data collected in the form of primary data which can be obtained by field surveys in the form of calculating the number of boarding passengers and secondary data obtained from the Aceh Transportation Agency which consists of the operational costs of Trans Koetaradja Bus vehicles corridor 3B. Corridor 3B has 3 units of medium buses which are operated every day, namely 3 medium buses that cover a route length of 12.20 km per route. Vehicle operational costs that must be incurred for 3 medium buses on corridor 3B are Rp. 783,716,730,- per year. The results of the tariff analysis on corridor 3B used the BOK value and a load factor of 28.42% using the Ministry of Transportation (2002) method, which was Rp.9,000.-. The results obtained from the financial feasibility analysis for 14 years using interest rates or discount rates of 8%, 10%, 12% and 15% obtained IRR in the conditions of NPV = 0 and BCR = 1 of 13.20%, then the Trans Koetaradja Bus corridor 3B declared financially feasible to operate at interest rates or discount rates of 8%, 10%, 12% and 13.20%, when seen at the discount rate above 13.20% it can be concluded that the bus operation is not yet financially feasible with the interest rate interest in the highest payback period of 13.20% requires a payback period from operating the bus in the 14th year. Keywords: Trans Koetaradja, tarrif, VOC, financial feasibility
Zitieren
APA
Faisal, R., Lulusi, L., & Azwar, A. (2026). Analisis Analisis Tarif Trans Koetaradja Berdasarkan Pendekatan BOK Study Kasus Koridor 3B (Pusat Kota – Lhong Raya – Mata Ie). Journal of The Civil Engineering Student, 8(2). https://doi.org/10.24815/ces.v8i2.2412
Vancouver
Faisal R, Lulusi L, Azwar A. Analisis Analisis Tarif Trans Koetaradja Berdasarkan Pendekatan BOK Study Kasus Koridor 3B (Pusat Kota – Lhong Raya – Mata Ie). Journal of The Civil Engineering Student. 2026;8(2). doi:10.24815/ces.v8i2.2412
BibTeX
@article{Faisal2026,
author = {Faisal, Ruhdi and Lulusi, Lulusi and Azwar, Azwar},
title = {Analisis Analisis Tarif Trans Koetaradja Berdasarkan Pendekatan BOK Study Kasus Koridor 3B (Pusat Kota – Lhong Raya – Mata Ie)},
journal = {Journal of The Civil Engineering Student},
year = {2026},
volume = {8},
number = {2},
doi = {10.24815/ces.v8i2.2412}
}
EUVIMED