EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

DT, BIM, and IoTs Contributions and Barriers in Construction PM: A PRISMA

Marwan Abdulqader, Aidi Hizami Bin Alias, Nuzul Azam Haron, M.Y.M Zuhri

Civil and Environmental Engineering · 01.03.2026 · 22 (1) · 119-140

DOI: 10.2478/cee-2026-0009 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Civil and Environmental Engineering, online erschienen am 24.03.2026. Verfasst von Marwan Abdulqader und 3 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 81 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Developed nations noticed pivotal relevance of Construction 5.0 through various cutting-edge digital solutions, contributing to promoted progress control and various alleviated risks. This offered a road map for developing countries to implement such strategies for amended construction project management (PM). Out of all these breakthroughs, digital twin (DT), building information modeling (BIM), and the Internet of Things (IoTs) have been extensively introduced lately. Construction PM aims to organize complex enterprise tasks, alleviate delays and cost overruns, and reduce controversies that could cause court claims and lengthy disputes. This paper utilizes PRISMA to highlight diverse DT, BIM, and IoT implementation impediments in developing lands, providing key statistics, influential insights, and possible plans of action to adopt DT, BIM, and IoTs flexibly in construction. The PRISMA results revealed that DT supplies project managers with a clear image concerning potential opportunities and risks of construction projects before being executed. BIM enables full visualization of the project. It fosters influential collaboration and understanding among parties. It raises productivity. Cheap IoTs sensors can be installed at critical project locations to record real-time data and track the progress. Simulations can predict future progress scenarios from these data. Since construction has the low pace of digitalization globally, evidence-based practices are still needed. Thus, consultants, contractors, and project managers can adopt these dynamic Construction 5.0 tools.

Zitieren

APA

Abdulqader, M., Alias, A. H. B., Haron, N. A., & Zuhri, M. (2026). DT, BIM, and IoTs Contributions and Barriers in Construction PM: A PRISMA. Civil and Environmental Engineering, 22(1), 119-140. https://doi.org/10.2478/cee-2026-0009

Vancouver

Abdulqader M, Alias AHB, Haron NA, Zuhri M. DT, BIM, and IoTs Contributions and Barriers in Construction PM: A PRISMA. Civil and Environmental Engineering. 2026;22(1):119-140. doi:10.2478/cee-2026-0009

BibTeX
@article{Abdulqader2026,
  author = {Abdulqader, Marwan and Alias, Aidi Hizami Bin and Haron, Nuzul Azam and Zuhri, M.Y.M},
  title = {DT, BIM, and IoTs Contributions and Barriers in Construction PM: A PRISMA},
  journal = {Civil and Environmental Engineering},
  year = {2026},
  volume = {22},
  number = {1},
  pages = {119--140},
  doi = {10.2478/cee-2026-0009}
}
Kostenlos starten →