Fuzzy Comprehensive Risk Evaluation of China’s Metro Transportation Public-Private Partnership Projects

Jinghan Yu, Djoen San Santoso

Civil and Environmental Engineering · 01.12.2025 · 21 (2) · 765-787

DOI: 10.2478/cee-2025-0056 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Civil and Environmental Engineering, online erschienen am 16.06.2025. Verfasst von Jinghan Yu und 1 weiteren Autor:innen. Die Arbeit wurde bisher 2-mal zitiert (Crossref) und nennt 37 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The Public-Private Partnership (PPP) model has been widely adopted in China’s metro infrastructure to enhance resource allocation efficiency. However, PPP projects have a long life cycle and diverse risk factors, and effective risk assessment is thereby essential to achieve project success. This study develops a fuzzy comprehensive risk evaluation model by integrating the Analytic Hierarchy Process (AHP) and Fuzzy Comprehensive Evaluation methods. A comprehensive risk indicator set consisting of 11 dimensions and 45 indicators is established, and AHP method is applied to calculate indicators importance weights. Subsequently, the weights are combined with fuzzy mathematical theory to quantitatively assess the risk levels by calculating the risk level scores. Then, by applying this model to the Tianjin Metro Line 7 Phase 1 project, the study identifies that political, construction phase, financing phase, economic, and legal risks as the five key risk indicators, while external and social risks are found to be less significant. The overall project risk level is assessed as above-moderate. Moreover, expert interpretation is conducted to discuss results and propose risk management strategies for key risk indicators. This study validates the fuzzy comprehensive risk evaluation model through case application, provides practical reference for risk management in PPP metro projects.

Zitieren

APA

Yu, J., & Santoso, D. S. (2025). Fuzzy Comprehensive Risk Evaluation of China’s Metro Transportation Public-Private Partnership Projects. Civil and Environmental Engineering, 21(2), 765-787. https://doi.org/10.2478/cee-2025-0056

Vancouver

Yu J, Santoso DS. Fuzzy Comprehensive Risk Evaluation of China’s Metro Transportation Public-Private Partnership Projects. Civil and Environmental Engineering. 2025;21(2):765-787. doi:10.2478/cee-2025-0056

BibTeX
@article{Yu2025,
  author = {Yu, Jinghan and Santoso, Djoen San},
  title = {Fuzzy Comprehensive Risk Evaluation of China’s Metro Transportation Public-Private Partnership Projects},
  journal = {Civil and Environmental Engineering},
  year = {2025},
  volume = {21},
  number = {2},
  pages = {765--787},
  doi = {10.2478/cee-2025-0056}
}
Kostenlos starten →