Operation and Effects Analysis of the System for Conductor Temperature Remote Monitoring and Real-time Ampacity Forecast on the OHL 110 kV Banja Luka 1 – Banja Luka 6/I After Five Years of Operation
B&H Electrical Engineering · 04.08.2026
DOI: 10.2478/bhee-2026-0029 ↗Kurz gefasst
Fachartikel in der Zeitschrift B&H Electrical Engineering, online erschienen am 04.08.2026. Verfasst von Nikola Đoković und 2 weiteren Autor:innen. Die Arbeit nennt 6 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).
Abstract (Originalsprache)
This paper presents architecture of dynamic thermal rate (DTR) system installed on OHL 110 kV Banja Luka 1 -Banja Luka 6/I. The paper presents performance of the system, conductor temperatures reached during the past five years period of exploitation as well as meteorological data from meteorological station in correlation to power consumption data of the area of interest. The critical scenarios in transmission line operation were analysed and conclusions were drawn regarding the justification of the DTR system installation against to a transmission line reconstruction.
Zitieren
APA
Đoković, N., Todorović, J., & Jankelić, D. (2026). Operation and Effects Analysis of the System for Conductor Temperature Remote Monitoring and Real-time Ampacity Forecast on the OHL 110 kV Banja Luka 1 – Banja Luka 6/I After Five Years of Operation. B&H Electrical Engineering. https://doi.org/10.2478/bhee-2026-0029
Vancouver
Đoković N, Todorović J, Jankelić D. Operation and Effects Analysis of the System for Conductor Temperature Remote Monitoring and Real-time Ampacity Forecast on the OHL 110 kV Banja Luka 1 – Banja Luka 6/I After Five Years of Operation. B&H Electrical Engineering. 2026. doi:10.2478/bhee-2026-0029
BibTeX
@article{okovi2026,
author = {Đoković, Nikola and Todorović, Jovan and Jankelić, Dejana},
title = {Operation and Effects Analysis of the System for Conductor Temperature Remote Monitoring and Real-time Ampacity Forecast on the OHL 110 kV Banja Luka 1 – Banja Luka 6/I After Five Years of Operation},
journal = {B&H Electrical Engineering},
year = {2026},
doi = {10.2478/bhee-2026-0029}
}
EUVIMED