EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-ND 4.0

Scheduling of construction projects base on Z-numbers

Dorota Kuchta, Dariusz Skorupka, Ewa Marchwicka, Agata Klaus Rosińska, Karol Pochybełko, Dominika Dudziak-Gajowiak, Artur Duchaczek

Archives of Civil Engineering · 30.06.2026 · 72 (2)

DOI: 10.24425/ace.2026.158617 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Archives of Civil Engineering, online erschienen am 30.06.2026. Verfasst von Dorota Kuchta und 6 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-ND 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The article addresses the challenge of scheduling construction projects given the considerable uncertainty associated with project time estimation. Afuzzy approach, which allows for modelling uncertainty, is employed to represent the duration of project tasks. It is shown, however, that the most well-known fuzzy numbers do not encompass all aspects of uncertainty. This study thus introduces a novel application of a specific type of fuzzy numbers, the Z-numbers, which allow for the consideration of several factors that strongly influence the estimation process, including individual human characteristics, experience, and the project and task context. The underlying theory is discussed, and its application to the scheduling of construction projects is proposed. The approach and its benefits are demonstrated through a practical example involving the construction of a single-family house. Advantages include a more credible and accurate estimation of task durations that accounts for uncertainty while mitigating subjective, individual, and context-dependent elements. Further research perspectives are also outlined.

Zitieren

APA

Kuchta, D., Skorupka, D., Marchwicka, E., Rosińska, A. K., Pochybełko, K., Dudziak-Gajowiak, D., & Duchaczek, A. (2026). Scheduling of construction projects base on Z-numbers. Archives of Civil Engineering, 72(2). https://doi.org/10.24425/ace.2026.158617

Vancouver

Kuchta D, Skorupka D, Marchwicka E, Rosińska AK, Pochybełko K, Dudziak-Gajowiak D, et al. Scheduling of construction projects base on Z-numbers. Archives of Civil Engineering. 2026;72(2). doi:10.24425/ace.2026.158617

BibTeX
@article{Kuchta2026,
  author = {Kuchta, Dorota and Skorupka, Dariusz and Marchwicka, Ewa and Rosińska, Agata Klaus and Pochybełko, Karol and Dudziak-Gajowiak, Dominika and Duchaczek, Artur},
  title = {Scheduling of construction projects base on Z-numbers},
  journal = {Archives of Civil Engineering},
  year = {2026},
  volume = {72},
  number = {2},
  doi = {10.24425/ace.2026.158617}
}
Kostenlos starten →