EUVIMEDEUVIMED entdecken
Crossref

A Review on Time and Cost Issues of Infrastructure Projects

Anjay Kumar Mishra

Journal of Advanced Research in Construction and Urban Architecture · 2018

DOI: 10.24321/2456.9925.201807 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Advanced Research in Construction and Urban Architecture, 2018. Verfasst von Anjay Kumar Mishra. Die Arbeit wurde bisher 4-mal zitiert (Crossref).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The research is a review research conducted on the issues of time and cost performance of infrastructure projects in global and local context using content analysis. Time extension is a serious issue and further research for specific project should be conducted to search the effective measures in the area. During project based study the quality part should be assured as time and cost may be affected by or can affect quality of the project. The review has highlighted several factors affecting time overrun and cost overrun along with the relation between the same. Time, Cost and Quality are three sides of a project performance triangle. Project is one time unique process with specific objective which is source of innovation and development. Time extension is not an exception but norms for infrastructure projects should be verified through ecological testing and possible measures should be strongly enforced for systematic performance improvements of projects. The study will be significant for policy maker and professional project managers working in the sector of infrastructure development projects.

Zitieren

APA

Mishra, A. K. (2018). A Review on Time and Cost Issues of Infrastructure Projects. Journal of Advanced Research in Construction and Urban Architecture. https://doi.org/10.24321/2456.9925.201807

Vancouver

Mishra AK. A Review on Time and Cost Issues of Infrastructure Projects. Journal of Advanced Research in Construction and Urban Architecture. 2018. doi:10.24321/2456.9925.201807

BibTeX
@article{Mishra2018,
  author = {Mishra, Anjay Kumar},
  title = {A Review on Time and Cost Issues of Infrastructure Projects},
  journal = {Journal of Advanced Research in Construction and Urban Architecture},
  year = {2018},
  doi = {10.24321/2456.9925.201807}
}
Kostenlos starten →