Analysis of Key Performance Indicators in Health Building Construction in Nepal

Subash Kumar Bhattara

Journal of Advanced Research in Civil and Environmental Engineering · 2021

DOI: 10.24321/2393.8307.202107 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Advanced Research in Civil and Environmental Engineering, 2021. Verfasst von Subash Kumar Bhattara.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Key Performance Indicators (KPI) in a construction project show how successfully the project has been executed. The information from the KPI measurement guides the implementer to collect the feedback which can be fed in for the new projects to be implemented. This study aim was to assess key performance indicators for health building construction, its ranking, the most important affecting factor for each KPI, and how to improving KPIs in a health building construction in Nepal. The data were collected from project stakeholders through a questionnaire survey. The project stakeholders were the contractors and health building section personnel of DUDBC. Data were summarized, analyzed, and presented in tables using Microsoft Excel. The study found that the stakeholders working in health building construction projects thought quality factor as the most important KPI with the first rank. The cost factor and time factor are correspondingly second and third-ranked, whereas, client satisfaction is the least important KPI. The study also showed the Relative Importance Index (RII) for the various factors affecting each KPI in the health building construction. For KPI-cost most important affecting factor is price escalation. For KPI-time it is the approved project schedule. The possible ways to improve the KPIs in health building construction are listed as conducting regular management meeting, implementing the provisions of the contract agreement, establishment of the proper communication system, timely monitoring of the progress, establishment of quality assurance and control system, adaptation of the cost and schedule control system, ensure the proper health and safety provisions to the workers, an early warning system for changes, regular updates of the work plan and program, regular training on project management, proper site management, proper management of manpower involved in the construction and better inventory management of contractors.

Zitieren

APA

Bhattara, S. K. (2021). Analysis of Key Performance Indicators in Health Building Construction in Nepal. Journal of Advanced Research in Civil and Environmental Engineering. https://doi.org/10.24321/2393.8307.202107

Vancouver

Bhattara SK. Analysis of Key Performance Indicators in Health Building Construction in Nepal. Journal of Advanced Research in Civil and Environmental Engineering. 2021. doi:10.24321/2393.8307.202107

BibTeX
@article{Bhattara2021,
  author = {Bhattara, Subash Kumar},
  title = {Analysis of Key Performance Indicators in Health Building Construction in Nepal},
  journal = {Journal of Advanced Research in Civil and Environmental Engineering},
  year = {2021},
  doi = {10.24321/2393.8307.202107}
}
Kostenlos starten →