EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC-SA 4.0

Manpower Requirement Analysis in HVAC Engineering Operations Using Work Sampling and Full-Time Equivalent

Agus Syahabuddin, Edi Supriyadi, Rully Nurdewanti

Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri · 21.11.2026 · 12 (2) · 303-312

DOI: 10.24014/jti.v12i2.39654 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri, online erschienen am 21.11.2026. Verfasst von Agus Syahabuddin und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Project-based heating, ventilation, and air conditioning (HVAC) engineering operations require alignment between technical workload and workforce capacity to meet service deadlines. A descriptive single-case study evaluates overtime and workload-equivalent staffing requirements in a six-person design engineering team using Work Sampling, Full-Time Equivalent (FTE), and Fishbone Analysis. Operational records cover April 2023–March 2024, while Work Sampling comprises 3,526 observations over 16 working days. Work-related activities accounted for 74.42%, with a nominal 95% confidence interval of 72.94–75.85% under the independent-observation assumption, while the remaining 25.58% included necessary personal activities and potentially avoidable interruptions. Based on reported normal times, annual task frequencies, a provisional allowance of 26% of standard time, and 237 eight-hour working days, the modelled annual workload reached 482,925.68 minutes, equivalent to 4.25 FTE. Nevertheless, the engineering team recorded 457 overtime hours, peaking at 86 hours in December 2023. Monthly work-item counts were not significantly correlated with overtime (r = −0.181; p = 0.574). The illustrative monthly workload scenario ranged from 3.28 to 5.11 FTE. These findings highlight the importance of evaluating workload distribution, employee competencies, operational constraints, and peak demand before determining appropriate staffing levels and implementing manpower adjustments.

Zitieren

APA

Syahabuddin, A., Supriyadi, E., & Nurdewanti, R. (2026). Manpower Requirement Analysis in HVAC Engineering Operations Using Work Sampling and Full-Time Equivalent. Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri, 12(2), 303-312. https://doi.org/10.24014/jti.v12i2.39654

Vancouver

Syahabuddin A, Supriyadi E, Nurdewanti R. Manpower Requirement Analysis in HVAC Engineering Operations Using Work Sampling and Full-Time Equivalent. Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri. 2026;12(2):303-312. doi:10.24014/jti.v12i2.39654

BibTeX
@article{Syahabuddin2026,
  author = {Syahabuddin, Agus and Supriyadi, Edi and Nurdewanti, Rully},
  title = {Manpower Requirement Analysis in HVAC Engineering Operations Using Work Sampling and Full-Time Equivalent},
  journal = {Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri},
  year = {2026},
  volume = {12},
  number = {2},
  pages = {303--312},
  doi = {10.24014/jti.v12i2.39654}
}
Kostenlos starten →