EUVIMEDEUVIMED entdecken
Open Access · CC BY-NC 4.0

PENERAPAN REQUIREMENT CHANGE MANAGEMENT PROCESS DAN FUNCTION POINT ANALYSIS PADA BACKEND SISTEM MANAJEMEN PROYEK (STUDI KASUS PERUSAHAAN XYZ)

Ahmad Rafaly Ahmad Rafaly, Wahyu Eko Sulistiono, Resty Anisa, Gigih Forda Nama

Jurnal Informatika dan Teknik Elektro Terapan · 13.08.2026 · 14 (3)

DOI: 10.23960/jitet.v14i3.9515 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Jurnal Informatika dan Teknik Elektro Terapan, online erschienen am 13.08.2026. Verfasst von Ahmad Rafaly Ahmad Rafaly und 3 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-NC 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Abstrak. Perubahan kebutuhan perangkat lunak yang tidak dikelola dengan baik seringkali menyebabkan keterlambatan dan pembengkakan biaya proyek. Untuk mengatasi masalah tersebut di perusahaan XYZ, penelitian ini mengembangkan backend Sistem Manajemen Proyek berbasis Laravel dengan menerapkan metode Requirement Change Management (RCM) dan Function Point Analysis (FPA). Pendekatan RCM digunakan untuk mendokumentasikan dan mengendalikan usulan perubahan, sementara FPA dimanfaatkan untuk mengukur kompleksitas serta memberikan estimasi waktu dan biaya di awal proyek. Hasil pengujian fungsional menunjukkan bahwa seluruh fungsi backend berjalan sempurna tanpa kesalahan. Selain itu, validasi estimasi pada dua proyek riil (Sistem X dan Y) membuktikan bahwa implementasi FPA pada sistem mampu menghasilkan tingkat akurasi estimasi rata-rata sebesar 89% untuk biaya dan 84% untuk waktu. Abstract. Poorly managed software requirements changes often lead to project delays and cost overruns. To solve these issues at XYZ Company, this study developed a Laravel-based Project Management System backend by implementing the Requirement Change Management (RCM) and Function Point Analysis (FPA) methods. The RCM approach was used to document and control proposed changes, while FPA was utilized to measure complexity and provide time and cost estimates at the beginning of the project.The functional testing results showed that all backend functions ran perfectly without errors. In addition, estimation validation on two real projects (System X and Y) proved that the implementation of FPA in the system was able to produce an average estimation accuracy rate of 89% for cost and 84% for time.

Zitieren

APA

Rafaly, A. R. A., Sulistiono, W. E., Anisa, R., & Nama, G. F. (2026). PENERAPAN REQUIREMENT CHANGE MANAGEMENT PROCESS DAN FUNCTION POINT ANALYSIS PADA BACKEND SISTEM MANAJEMEN PROYEK (STUDI KASUS PERUSAHAAN XYZ). Jurnal Informatika dan Teknik Elektro Terapan, 14(3). https://doi.org/10.23960/jitet.v14i3.9515

Vancouver

Rafaly ARA, Sulistiono WE, Anisa R, Nama GF. PENERAPAN REQUIREMENT CHANGE MANAGEMENT PROCESS DAN FUNCTION POINT ANALYSIS PADA BACKEND SISTEM MANAJEMEN PROYEK (STUDI KASUS PERUSAHAAN XYZ). Jurnal Informatika dan Teknik Elektro Terapan. 2026;14(3). doi:10.23960/jitet.v14i3.9515

BibTeX
@article{Rafaly2026,
  author = {Rafaly, Ahmad Rafaly Ahmad and Sulistiono, Wahyu Eko and Anisa, Resty and Nama, Gigih Forda},
  title = {PENERAPAN REQUIREMENT CHANGE MANAGEMENT PROCESS DAN FUNCTION POINT ANALYSIS PADA BACKEND SISTEM MANAJEMEN PROYEK (STUDI KASUS PERUSAHAAN XYZ)},
  journal = {Jurnal Informatika dan Teknik Elektro Terapan},
  year = {2026},
  volume = {14},
  number = {3},
  doi = {10.23960/jitet.v14i3.9515}
}
Kostenlos starten →