EUVIMEDEUVIMED entdecken
Open Access

Finding the Waste: Parts Inventory Analysis Using Lean Methodology

Marie-Ange Janvier, Andrew A M Ibey, Kajal Madhusudan, Ishtar Al-Tahir, Mark R Asbil, Kim Greenwood

Biomedical Instrumentation & Technology · 2024

DOI: 10.2345/0899-8205-58.4.72 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Biomedical Instrumentation & Technology, 2024. Verfasst von Marie-Ange Janvier und 5 weiteren Autor:innen. Hauptthemen laut MEDLINE: Efficiency, Organizational, Biomedical Engineering, Inventories, Hospital. Die Arbeit nennt 12 Literaturangaben. Der Volltext ist frei in PubMed Central verfügbar.

AbstractSchlagwörterBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

During a 12-year period (2011-23), the number of staff in the Clinical Engineering (CE) Department at the Children's Hospital of Eastern Ontario (CHEO) increased from five to more than 20 biomedical equipment technicians/technologists. However, despite this increase in staff, processes did not evolve and procedures that used modern technological and shipping advances were not implemented. The absence of standardized procurement and inventory processes for parts created discrepancies between on-hand inventory and the computerized maintenance management system (CMMS). Owing to inaccurate CMMS information and unsystematic parts documentation, time and money were wasted. This situation led to a lack of confidence in CMMS data, causing staff disengagement, loss of accountability, and limited parts tracking. The current article describes a project that used Lean methodologies and use of the define, measure, analyze, improve, and control structure, including tools such as interviews, a survey, process mapping, and Gemba walks, to create a list of prioritized problems. A total of 16 problems were formulated, four of which were identified as prerequisites to be implemented regardless of prioritization. The four prerequisites described the scope of each problem and potential solutions. The goal of this process was to create a workflow that could save time and money while improving the morale of stakeholders involved in the parts procurement and inventory process.

Schlagwörter

MeSH-Schlagwörter (MEDLINE)

Efficiency, OrganizationalBiomedical EngineeringInventories, HospitalOntarioHumansHospitals, PediatricWorkflow

Zitieren

APA

Janvier, M. A., Ibey, A. A. M., Madhusudan, K., Al-Tahir, I., Asbil, M. R., & Greenwood, K. (2024). Finding the Waste: Parts Inventory Analysis Using Lean Methodology. Biomedical Instrumentation & Technology. https://doi.org/10.2345/0899-8205-58.4.72

Vancouver

Janvier MA, Ibey AAM, Madhusudan K, Al-Tahir I, Asbil MR, Greenwood K. Finding the Waste: Parts Inventory Analysis Using Lean Methodology. Biomedical Instrumentation & Technology. 2024. doi:10.2345/0899-8205-58.4.72

BibTeX
@article{Janvier2024,
  author = {Janvier, Marie-Ange and Ibey, Andrew A M and Madhusudan, Kajal and Al-Tahir, Ishtar and Asbil, Mark R and Greenwood, Kim},
  title = {Finding the Waste: Parts Inventory Analysis Using Lean Methodology},
  journal = {Biomedical Instrumentation & Technology},
  year = {2024},
  doi = {10.2345/0899-8205-58.4.72}
}
Kostenlos starten →