Application of goal programming model for allocating time and cost in project management: A case study from the company of construction SEROR
Yugoslav Journal of Operations Research · 2015 · 25 (2) · 283-289
DOI: 10.2298/yjor131010010y ↗Kurz gefasst
Fachartikel in der Zeitschrift Yugoslav Journal of Operations Research, 2015. Verfasst von Abdelkrim Yahia-Berrouiguet und 1 weiteren Autor:innen. Die Arbeit wurde bisher 8-mal zitiert (Crossref). Der Volltext ist frei zugänglich (Open Access, CC BY-NC-SA 4.0).
Abstract (Originalsprache)
The objective of this paper is to apply one of the techniques of multipleobjective programming (goal programming) in a project management problem. Mubiru (2010) proposed a goal programming model for allocating time and cost in project management. In order to test this model, a case study was accomplished in the company of construction SEROR, Algeria.
Zitieren
APA
Yahia-Berrouiguet, A., & Tissourassi, K. (2015). Application of goal programming model for allocating time and cost in project management: A case study from the company of construction SEROR. Yugoslav Journal of Operations Research, 25(2), 283-289. https://doi.org/10.2298/yjor131010010y
Vancouver
Yahia-Berrouiguet A, Tissourassi K. Application of goal programming model for allocating time and cost in project management: A case study from the company of construction SEROR. Yugoslav Journal of Operations Research. 2015;25(2):283-289. doi:10.2298/yjor131010010y
BibTeX
@article{YahiaBerrouiguet2015,
author = {Yahia-Berrouiguet, Abdelkrim and Tissourassi, Khadija},
title = {Application of goal programming model for allocating time and cost in project management: A case study from the company of construction SEROR},
journal = {Yugoslav Journal of Operations Research},
year = {2015},
volume = {25},
number = {2},
pages = {283--289},
doi = {10.2298/yjor131010010y}
}
EUVIMED