EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Periodic Maintenance Analysis Of Locomotive Series CC201 And CC203 Using Markov Chain Method at UPT.Balaiyasa Yogyakarta

Muhammad Nafidz Zufar, Beni Setya Nugraha, Sudarwanto

Journal of Automotive and Mechanical Applied Technology · 2024

DOI: 10.21831/jamat.v1i1.816 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Automotive and Mechanical Applied Technology, 2024. Verfasst von Muhammad Nafidz Zufar und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The objectives of this study are: (1) To get and provide the right periodic maintenance implementation time on CC201 locomotive maintenance. (2) To get and provide the right periodic maintenance implementation time on CC203 locomotive maintenance. The method used in this research is Markov Chain, using the type of applied research. This research uses a quantitative approach. The data collection techniques used are (1) Primary Data Collection; and (2) Secondary Data Collection. Meanwhile, the research instruments used (1) Observation Sheet; and (2) Documentation. The data analysis used is (1) Determination of Condition or State; (2) Creating a Transition Matrix; and (3) Steady State Analysis to get the probability of locomotive conditions in good condition, lightly damaged, moderately damaged or severely damaged. The results of this study show that: (1) The right periodic maintenance implementation time on CC201 locomotive maintenance is proposal II at interval P2 with the highest probability of good condition of 0.609 and the lowest probability of heavy condition of 0.021. With this, a maintenance scheduling policy is obtained for every 1 month to perform periodic maintenance on day 7,128. (2) The right periodic maintenance implementation time for CC203 locomotive maintenance is proposal II at interval P2 with the highest probability in good condition of 0.619 and the lowest probability in severe condition of 0.142. With this, a maintenance scheduling policy is obtained for every 1 month to perform periodic maintenance on day 24,516.

Zitieren

APA

Zufar, M. N., Nugraha, B. S., & Sudarwanto (2024). Periodic Maintenance Analysis Of Locomotive Series CC201 And CC203 Using Markov Chain Method at UPT.Balaiyasa Yogyakarta. Journal of Automotive and Mechanical Applied Technology. https://doi.org/10.21831/jamat.v1i1.816

Vancouver

Zufar MN, Nugraha BS, Sudarwanto. Periodic Maintenance Analysis Of Locomotive Series CC201 And CC203 Using Markov Chain Method at UPT.Balaiyasa Yogyakarta. Journal of Automotive and Mechanical Applied Technology. 2024. doi:10.21831/jamat.v1i1.816

BibTeX
@article{Zufar2024,
  author = {Zufar, Muhammad Nafidz and Nugraha, Beni Setya and Sudarwanto},
  title = {Periodic Maintenance Analysis Of Locomotive Series CC201 And CC203 Using Markov Chain Method at UPT.Balaiyasa Yogyakarta},
  journal = {Journal of Automotive and Mechanical Applied Technology},
  year = {2024},
  doi = {10.21831/jamat.v1i1.816}
}
Kostenlos starten →