EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Pre- and postprocessing flood forecasts using Bayesian model averaging

TrineJahr Hegdahl, Kolbjørn Engeland, Ingelin Steinsland, Andrew Singleton

Hydrology Research · 2023-02 · 54 (2) · 116-135

DOI: 10.2166/nh.2023.024 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Hydrology Research, 2023-02. Verfasst von TrineJahr Hegdahl und 3 weiteren Autor:innen. Die Arbeit wurde bisher 12-mal zitiert (Crossref) und nennt 53 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

In this study, pre- and postprocessing of hydrological ensemble forecasts are evaluated with a special focus on floods for 119 Norwegian catchments. Two years of ECMWF ensemble forecasts of temperature and precipitation with a lead time of up to 9 days were used to force the operational hydrological HBV model to establish streamflow forecasts. A Bayesian model averaging processing approach was applied to preprocess temperature and precipitation forecasts and to postprocessing streamflow forecasts. Ensemble streamflow forecasts were generated for eight schemes based on combinations of raw, preprocessed, and postprocessed forecasts. Two datasets were used to evaluate the forecasts: (i) all streamflow forecasts and (ii) forecasts for flood events with streamflow above mean annual flood. Evaluations based on all streamflow data showed that postprocessing improved the forecasts only up to a lead time of 2–3 days, whereas preprocessing temperature and precipitation improved the forecasts for 50–90% of the catchments beyond 3 days lead time. We found large differences in the ability to issue warnings between spring and autumn floods. Spring floods had predictability for up to 9 days for many events and catchments, whereas the ability to predict autumn floods beyond 3 days was marginal.

Zitieren

APA

Hegdahl, T., Engeland, K., Steinsland, I., & Singleton, A. (2023). Pre- and postprocessing flood forecasts using Bayesian model averaging. Hydrology Research, 54(2), 116-135. https://doi.org/10.2166/nh.2023.024

Vancouver

Hegdahl T, Engeland K, Steinsland I, Singleton A. Pre- and postprocessing flood forecasts using Bayesian model averaging. Hydrology Research. 2023;54(2):116-135. doi:10.2166/nh.2023.024

BibTeX
@article{Hegdahl2023,
  author = {Hegdahl, TrineJahr and Engeland, Kolbjørn and Steinsland, Ingelin and Singleton, Andrew},
  title = {Pre- and postprocessing flood forecasts using Bayesian model averaging},
  journal = {Hydrology Research},
  year = {2023},
  volume = {54},
  number = {2},
  pages = {116--135},
  doi = {10.2166/nh.2023.024}
}
Kostenlos starten →