Simulation of dam-break flood and risk assessment: a case study of Chengbi River Dam in Baise, China
Journal of Hydroinformatics · 01.07.2023 · 25 (4) · 1276-1294
DOI: 10.2166/hydro.2023.193 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Hydroinformatics, online erschienen am 08.06.2023. Verfasst von Chongxun Mo und 7 weiteren Autor:innen. Die Arbeit wurde bisher 17-mal zitiert (Crossref) und nennt 33 Literaturangaben. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0). Gefördert von: National Natural Science Foundation of China, Interdisciplinary Scientific Research Foundation of Guangxi University.
Abstract (Originalsprache)
When a reservoir is damaged, it will bring destruction to people's lives and the regional economy. Flood simulation and risk assessment are two effective ways to mitigate flood risk. Flood risk is assessed by using flood hazard and vulnerability indices. However, one of the key concerns is how to quantify hazards and vulnerabilities more rationally. To this end, this study introduces a new quantitative method for flood risk assessment. Three schemes – full dam breach (S1), 1/2 dam breach (S2), and 1/3 dam breach (S3) – were proposed for flood simulation. HEC-RAS 2D was used to simulate the evolution process of dam-break floods. This study used a new quantification approach to calculate flood risk based on simulation results. The results show the following: (1) The inundation process is similar under the three schemes, but the degree differs. The greater the degree of dam break, the greater the inundation depth, maximum flow velocity, and inundation duration. (2) High-risk areas decrease with decreased dam break degree. Under the three schemes, the flood risk areas of Longjing Street account for 65.37, 71.41, and 66.22% of the total risk areas, respectively, which are the areas most affected by dam-break floods.
Förderung
- National Natural Science Foundation of China
- Interdisciplinary Scientific Research Foundation of Guangxi University
Zitieren
APA
Mo, C., Cen, W., Lei, X., Ban, H., Ruan, Y., Lai, S., Shen, Y., & Xing, Z. (2023). Simulation of dam-break flood and risk assessment: a case study of Chengbi River Dam in Baise, China. Journal of Hydroinformatics, 25(4), 1276-1294. https://doi.org/10.2166/hydro.2023.193
Vancouver
Mo C, Cen W, Lei X, Ban H, Ruan Y, Lai S, et al. Simulation of dam-break flood and risk assessment: a case study of Chengbi River Dam in Baise, China. Journal of Hydroinformatics. 2023;25(4):1276-1294. doi:10.2166/hydro.2023.193
BibTeX
@article{Mo2023,
author = {Mo, Chongxun and Cen, Weiyan and Lei, Xingbi and Ban, Huazhen and Ruan, Yuli and Lai, Shufeng and Shen, Yue and Xing, Zhenxiang},
title = {Simulation of dam-break flood and risk assessment: a case study of Chengbi River Dam in Baise, China},
journal = {Journal of Hydroinformatics},
year = {2023},
volume = {25},
number = {4},
pages = {1276--1294},
doi = {10.2166/hydro.2023.193}
}
EUVIMED