EUVIMEDEUVIMED entdecken
Crossref

The Proposed Maintenance Task for Plastic Injection Machine Using Reliability and Risk Centered Maintenance (RRCM) method in Manufacturing Industry

Liza Nafiah Maulidina, Fransiskus Tatas Dwi Atmaji, Judi Alhilman

ComTech: Computer, Mathematics and Engineering Applications · 31.12.2019 · 10 (2) · 83-92

DOI: 10.21512/comtech.v10i2.5900 ↗

Kurz gefasst

Fachartikel in der Zeitschrift ComTech: Computer, Mathematics and Engineering Applications, online erschienen am 31.12.2019. Verfasst von Liza Nafiah Maulidina und 2 weiteren Autor:innen. Die Arbeit wurde bisher 4-mal zitiert (Crossref) und nennt 20 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The objective of this research was to determine the optimal maintenance time interval for the selected critical components and the total cost of maintenance of a plastic injection machine. In determining the critical components, a risk matrix was used, and three components were selected, namely, hydraulic hose, barrel, and motor. Using the Reliability and Risk Centered Maintenance (RRCM) method, the researchers got a proposed maintenance policy and the total maintenance cost. Based on the result, it shows that there are seven proposed maintenance tasks with three scheduled oncondition tasks and four scheduled restoration tasks with an average maintenance interval of two months. The total maintenance cost proposed is IDR91.595.318. The cost is smaller compared to the actual maintenance costs of the company.

Zitieren

APA

Maulidina, L. N., Atmaji, F. T. D., & Alhilman, J. (2019). The Proposed Maintenance Task for Plastic Injection Machine Using Reliability and Risk Centered Maintenance (RRCM) method in Manufacturing Industry. ComTech: Computer, Mathematics and Engineering Applications, 10(2), 83-92. https://doi.org/10.21512/comtech.v10i2.5900

Vancouver

Maulidina LN, Atmaji FTD, Alhilman J. The Proposed Maintenance Task for Plastic Injection Machine Using Reliability and Risk Centered Maintenance (RRCM) method in Manufacturing Industry. ComTech: Computer, Mathematics and Engineering Applications. 2019;10(2):83-92. doi:10.21512/comtech.v10i2.5900

BibTeX
@article{Maulidina2019,
  author = {Maulidina, Liza Nafiah and Atmaji, Fransiskus Tatas Dwi and Alhilman, Judi},
  title = {The Proposed Maintenance Task for Plastic Injection Machine Using Reliability and Risk Centered Maintenance (RRCM) method in Manufacturing Industry},
  journal = {ComTech: Computer, Mathematics and Engineering Applications},
  year = {2019},
  volume = {10},
  number = {2},
  pages = {83--92},
  doi = {10.21512/comtech.v10i2.5900}
}
Kostenlos starten →