Analisis Efektivitas Mesin Batching Plant 1 dan Mesin Batching Plant 2 dengan Overall Equipment Effectiveness Pada PT. X

Nia Budi Puspitasari, Eldinda Sazida Permatasari

PERFORMA : Media Ilmiah Teknik Industri · 2015

DOI: 10.20961/performa.14.2.11032 ↗

Kurz gefasst

Fachartikel in der Zeitschrift PERFORMA : Media Ilmiah Teknik Industri, 2015. Verfasst von Nia Budi Puspitasari und 1 weiteren Autor:innen.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Overall Equipment Effectiveness (OEE) is one of Total Productive Maintenance (TPM) application program, which aims to determine the effectiveness of a machine. PT. X has 3 machine batching plant where machine 1 and 2 used effectively, from the data historically known that the machines batching plant 1 having a value greater namely 1030 minutes compared to the engine batching plant 2 that have value 240 minutes. This research measures the OEE value of two machines Bactching Plant and then compares the results. The value obtained is 82.71% for machine 1 and 84.83% for machine 2. This research suggests that the performance factor is the biggest problem in the machine OEE values, because the enterprise systems is make to order, the recommended action is to maximize the production capacity of each machine by considering a more accurate production targets in each period.

Zitieren

APA

Puspitasari, N. B., & Permatasari, E. S. (2015). Analisis Efektivitas Mesin Batching Plant 1 dan Mesin Batching Plant 2 dengan Overall Equipment Effectiveness Pada PT. X. PERFORMA : Media Ilmiah Teknik Industri. https://doi.org/10.20961/performa.14.2.11032

Vancouver

Puspitasari NB, Permatasari ES. Analisis Efektivitas Mesin Batching Plant 1 dan Mesin Batching Plant 2 dengan Overall Equipment Effectiveness Pada PT. X. PERFORMA : Media Ilmiah Teknik Industri. 2015. doi:10.20961/performa.14.2.11032

BibTeX
@article{Puspitasari2015,
  author = {Puspitasari, Nia Budi and Permatasari, Eldinda Sazida},
  title = {Analisis Efektivitas Mesin Batching Plant 1 dan Mesin Batching Plant 2 dengan Overall Equipment Effectiveness Pada PT. X},
  journal = {PERFORMA : Media Ilmiah Teknik Industri},
  year = {2015},
  doi = {10.20961/performa.14.2.11032}
}