Analisis Pengaruh Number of Stages dan Banyak Pompa ESP di Sumur X
Journal of Sustainable Energy Development · 2024
DOI: 10.19184/jsed.v2i2.1679 ↗Kurz gefasst
Fachartikel in der Zeitschrift Journal of Sustainable Energy Development, 2024. Verfasst von Eriska Eklezia Dwi Saputri und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).
Abstract (Originalsprache)
In well X, there has been a decline in oil production, leading to a decrease in the company’s revenue. This is due to an increase in the watercut percentage, as the reservoir itself operates on a water drive mechanism. Therefore, a follow-up action is needed to address this situation by using an artificial lift ESP with a tandem design. This approach aims to enhance the effectiveness and economic efficiency of the production process. The artificial lift Electrical Submersible Pump (ESP) used is a CENTRILIFT with model FC2700, series 400, installed at depths of 6371 ft and 6382 ft, respectively. A comparison of the two artificial lifts shows that the number of stages in the upper section is greater than in the lower section, resulting in a higher oil flow rate at the top, reaching 68.52 STB/d. Meanwhile, in the ESP well, oil flow rate has increased by 77.46 STB/d.
Zitieren
APA
Saputri, E. E. D., & Azizah, V. N. (2024). Analisis Pengaruh Number of Stages dan Banyak Pompa ESP di Sumur X. Journal of Sustainable Energy Development. https://doi.org/10.19184/jsed.v2i2.1679
Vancouver
Saputri EED, Azizah VN. Analisis Pengaruh Number of Stages dan Banyak Pompa ESP di Sumur X. Journal of Sustainable Energy Development. 2024. doi:10.19184/jsed.v2i2.1679
BibTeX
@article{Saputri2024,
author = {Saputri, Eriska Eklezia Dwi and Azizah, Vani Nur},
title = {Analisis Pengaruh Number of Stages dan Banyak Pompa ESP di Sumur X},
journal = {Journal of Sustainable Energy Development},
year = {2024},
doi = {10.19184/jsed.v2i2.1679}
}
EUVIMED