EUVIMEDEUVIMED entdecken
Open Access · CC BY-SA 4.0

ANALISIS KEBERHASILAN KERJA ULANG PINDAH LAPISAN PADA SUMUR SKW-33 LAPANGAN SUKOWATI

Desyana Nindya Prastiwi, Hadziqul Abror, Babas samudera Hafwandi

Journal of Sustainable Energy Development · 2024

DOI: 10.19184/jsed.v2i2.1603 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Journal of Sustainable Energy Development, 2024. Verfasst von Desyana Nindya Prastiwi und 2 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY-SA 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

This study explores the effectiveness of re-perforation operations at Well SKW-33 in the Sukowati Field to enhance oil production. The background highlights the decline in production rates despite the well's initial success with natural flow since June 2015. The primary objective is to evaluate the impact of re-perforation on oil production and water cut. The research employs methods such as squeeze cementing, Cement Bond Log (CBL) analysis, well logging and subsequent re-perforation. The results demonstrate a significant increase in oil production from 100-150 barrels per day (bopd) to a peak of 305 bopd post-re-perforation. Additionally, the water cut reduced from 95-96% to 80%, indicating a successful reduction in water production. The conclusion asserts that re-perforation significantly boosts short-term oil production and reduces water production, though ongoing management is essential for maintaining long-term efficiency.

Zitieren

APA

Prastiwi, D. N., Abror, H., & Hafwandi, B. S. (2024). ANALISIS KEBERHASILAN KERJA ULANG PINDAH LAPISAN PADA SUMUR SKW-33 LAPANGAN SUKOWATI. Journal of Sustainable Energy Development. https://doi.org/10.19184/jsed.v2i2.1603

Vancouver

Prastiwi DN, Abror H, Hafwandi BS. ANALISIS KEBERHASILAN KERJA ULANG PINDAH LAPISAN PADA SUMUR SKW-33 LAPANGAN SUKOWATI. Journal of Sustainable Energy Development. 2024. doi:10.19184/jsed.v2i2.1603

BibTeX
@article{Prastiwi2024,
  author = {Prastiwi, Desyana Nindya and Abror, Hadziqul and Hafwandi, Babas samudera},
  title = {ANALISIS KEBERHASILAN KERJA ULANG PINDAH LAPISAN PADA SUMUR SKW-33 LAPANGAN SUKOWATI},
  journal = {Journal of Sustainable Energy Development},
  year = {2024},
  doi = {10.19184/jsed.v2i2.1603}
}
Kostenlos starten →