Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment
International Journal of Engineering Technologies IJET · 03.03.2026 · 10 (4) · 69-80
DOI: 10.19072/ijet.1879062 ↗Kurz gefasst
Fachartikel in der Zeitschrift International Journal of Engineering Technologies IJET, online erschienen am 03.03.2026. Verfasst von Didem Sarı Ay. Die Arbeit wurde bisher 1-mal zitiert (Crossref) und nennt 38 Literaturangaben.
Abstract (Originalsprache)
Aggregate production planning (APP) requires balancing workforce and operational decisions over a medium-term horizon. This study formulates and applies a two-stage stochastic mixed integer linear program (MILP) for APP with the primary objective of evaluating strategic workforce planning decisions under demand uncertainty. Workforce decisions are modeled as here-and-now commitments, while operational decisions are optimized as recourse actions in response to realized demand. The framework is demonstrated in an illustrative furniture manufacturing setting over a 12-month horizon with seasonally varying cost parameters. Demand scenarios are generated by combining Holt–Winters point forecasts with forecast-error scenarios obtained through a rolling-origin procedure and a moment-matching approach, yielding demand trajectories that reflect the statistical properties and temporal dependence of forecast uncertainty. Using these scenarios, the model quantifies cost–service trade-offs under alternative backorder penalty severities. To assess the robustness of the resulting workforce plans, this study conducts an out-of-sample evaluation based on observed demand from a holdout year and a wait-and-see benchmark, a validation perspective that has received limited attention in the APP literature. The out-of-sample results indicate that the stochastic model produces feasible and cost-effective workforce decisions that remain near-optimal under observed demand. Overall, the proposed framework serves as an effective decision-support tool for APP under demand uncertainty, supporting the evaluation of workforce and operational decisions within a unified stochastic framework.
Zitieren
APA
Ay, D. S. (2026). Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment. International Journal of Engineering Technologies IJET, 10(4), 69-80. https://doi.org/10.19072/ijet.1879062
Vancouver
Ay DS. Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment. International Journal of Engineering Technologies IJET. 2026;10(4):69-80. doi:10.19072/ijet.1879062
BibTeX
@article{Ay2026,
author = {Ay, Didem Sarı},
title = {Evaluating Strategic Workforce Decisions in Aggregate Production Planning under Demand Uncertainty: A Two-Stage Stochastic MILP with Out-of-Sample Assessment},
journal = {International Journal of Engineering Technologies IJET},
year = {2026},
volume = {10},
number = {4},
pages = {69--80},
doi = {10.19072/ijet.1879062}
}
EUVIMED