EUVIMEDEUVIMED entdecken
Crossref

Analysis of wells cement sheath stability during shaped charge perforating based on geomechanical modeling

S. E. Chernyshov, S. N. Popov, A. D. Savich, V. V. Derendyaev

Georesursy · 30.06.2023 · 25 (2) · 245-253

DOI: 10.18599/grs.2023.2.18 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Georesursy, online erschienen am 30.06.2023. Verfasst von S. E. Chernyshov und 3 weiteren Autor:innen. Die Arbeit wurde bisher 3-mal zitiert (Crossref) und nennt 22 Literaturangaben. Gefördert von: Ministry of Science and Higher Education of the Russian Federation.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Well cement sheath stability analysis for two oil-producing wells in the completion of productive formations by shaped charge perforating was performed. The data of direct measurements of pressures in the borehole at different distances from the cable head of the perforating tool at the moment of detonation, which exceeded 50 MPa, were used in the studies. The pressure values were approximated along the wellbore using a power law. To reliably predict the stress-strain state of the near-wellbore zone of the perforation interval, the ANSYS finite-element modeling software was used. To determine the stress field, an axisymmetric finiteelement calculation scheme was built, the height of the model along the wellbore was 39 m. During modeling, it was taken into account that the geological and physical parameters of the simulated reservoirs differed in depth and reservoir pressure value were different. Elastic-strength properties of the cement stone formed were determined during the laboratory experiments for different recipes of cement slurries. According to the results of modeling, the areas of destruction and strength reserve of cement stone, as well as the values of radial displacement of the production casing in the perforation interval were determined. The developed model of the nearwellbore zone and methodical approaches can be used in future for choosing optimal elastic and strength properties of cement stone, perforation tools and technological parameters of perforating-explosive operations.

Förderung

  • Ministry of Science and Higher Education of the Russian Federation

Zitieren

APA

Chernyshov, S. E., Popov, S. N., Savich, A. D., & Derendyaev, V. V. (2023). Analysis of wells cement sheath stability during shaped charge perforating based on geomechanical modeling. Georesursy, 25(2), 245-253. https://doi.org/10.18599/grs.2023.2.18

Vancouver

Chernyshov SE, Popov SN, Savich AD, Derendyaev VV. Analysis of wells cement sheath stability during shaped charge perforating based on geomechanical modeling. Georesursy. 2023;25(2):245-253. doi:10.18599/grs.2023.2.18

BibTeX
@article{Chernyshov2023,
  author = {Chernyshov, S. E. and Popov, S. N. and Savich, A. D. and Derendyaev, V. V.},
  title = {Analysis of wells cement sheath stability during shaped charge perforating based on geomechanical modeling},
  journal = {Georesursy},
  year = {2023},
  volume = {25},
  number = {2},
  pages = {245--253},
  doi = {10.18599/grs.2023.2.18}
}
Kostenlos starten →