EUVIMEDEUVIMED entdecken
Crossref

Government Project Completion Performance: The Mediating Role of Monitoring Effectiveness in Maubara Administrative Post, Liquiçá Municipality, Timor-Leste

Nicodemos Jacinto dos Santos Pereira, Yuniningsih Yuniningsih, Ika Korika Swasti

Social Science and Humanities Journal · 2026 · 10 (11) · 10659-10666

DOI: 10.18535/sshj.v10i11.2581 ↗

Kurz gefasst

Fachartikel in der Zeitschrift Social Science and Humanities Journal, 2026. Verfasst von Nicodemos Jacinto dos Santos Pereira und 2 weiteren Autor:innen. Die Arbeit nennt 11 Literaturangaben.

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

Government project completion is an important concern for public infrastructure development and service delivery. This study examines the relationships between planning quality, contractor competence, budget control, monitoring effectiveness, and government project completion in Maubara Administrative Post, Liquiçá Municipality, Timor-Leste. It also investigates the mediating role of monitoring effectiveness. An explanatory quantitative design was employed, using questionnaire data collected from 92 government personnel selected from a population of 120 through simple random sampling. The data were analysed using partial least squares structural equation modelling (PLS-SEM) with SmartPLS 4. The results indicate that contractor competence and monitoring effectiveness are positively related to project completion. Planning quality and budget control do not demonstrate statistically supported direct relationships with project completion under the reported testing criteria. Planning quality and budget control are positively related to monitoring effectiveness. However, the indirect relationships through monitoring effectiveness were not statistically significant under the reported two-tailed 5% criterion. These findings highlight the practical importance of contractor competence and monitoring practices in government project management. The study also suggests that improving project completion requires attention to planning, financial control, and monitoring processes within the local administrative context.

Zitieren

APA

Pereira, N. J. D. S., Yuniningsih, Y., & Swasti, I. K. (2026). Government Project Completion Performance: The Mediating Role of Monitoring Effectiveness in Maubara Administrative Post, Liquiçá Municipality, Timor-Leste. Social Science and Humanities Journal, 10(11), 10659-10666. https://doi.org/10.18535/sshj.v10i11.2581

Vancouver

Pereira NJDS, Yuniningsih Y, Swasti IK. Government Project Completion Performance: The Mediating Role of Monitoring Effectiveness in Maubara Administrative Post, Liquiçá Municipality, Timor-Leste. Social Science and Humanities Journal. 2026;10(11):10659-10666. doi:10.18535/sshj.v10i11.2581

BibTeX
@article{Pereira2026,
  author = {Pereira, Nicodemos Jacinto dos Santos and Yuniningsih, Yuniningsih and Swasti, Ika Korika},
  title = {Government Project Completion Performance: The Mediating Role of Monitoring Effectiveness in Maubara Administrative Post, Liquiçá Municipality, Timor-Leste},
  journal = {Social Science and Humanities Journal},
  year = {2026},
  volume = {10},
  number = {11},
  pages = {10659--10666},
  doi = {10.18535/sshj.v10i11.2581}
}
Kostenlos starten →