EUVIMEDEUVIMED entdecken
Open Access · CC BY 4.0

Optimization of Multi-Contractor Housing Development Using Integer Linear Programming

Nevy Risna Dyah Kumala, Anno Mahfuda

International Journal on Advanced Science, Engineering and Information Technology · 25.04.2026 · 16 (2) · 508-516

DOI: 10.18517/ijaseit.16.2.21792 ↗

Kurz gefasst

Fachartikel in der Zeitschrift International Journal on Advanced Science, Engineering and Information Technology, online erschienen am 25.04.2026. Verfasst von Nevy Risna Dyah Kumala und 1 weiteren Autor:innen. Der Volltext ist frei zugänglich (Open Access, CC BY 4.0).

AbstractBibliografische AngabenZitierenVerwandte Studien

Abstract (Originalsprache)

The rapid growth of urban housing demand requires more efficient planning approaches, particularly for projects involving multiple contractors operating under limited time and resources. The objective of this study is to develop an Integer Linear Programming (ILP) model to minimize construction costs and optimize contractor workload distribution in multi-contractor housing projects under resource and timeline constraints. The materials used include construction costs, duration data, productivity coefficients, and contractor team capacities, collected from a housing development in Balikpapan, Indonesia, comprising 174 units across four housing types. The research object was chosen because with that many units, the implementation involved 4 contractors in a relatively short time. All parameters were integrated into a structured dataset, processed with software to obtain an optimal assignment of construction tasks, and used with the ILP model, along with overtime performance. Overtime plays a crucial role as a duration-compression mechanism, enabling high-workload contractors to complete tasks within feasible limits. The research findings also identified a balanced workload benchmark of approximately 42 units per contractor over 75 months. The optimized allocation results in an average operational duration of 75 months, which is comfortably within the 78-month maximum duration constraint. Future research should explore the incorporation of uncertainty factors, including labor variability and supply chain fluctuations, to assess their impact on the optimization model's robustness and reliability. Future studies should explore the integration of digital project management tools and assess the applicability of advanced or hybrid optimization techniques to strengthen industry adoption.

Zitieren

APA

Kumala, N. R. D., & Mahfuda, A. (2026). Optimization of Multi-Contractor Housing Development Using Integer Linear Programming. International Journal on Advanced Science, Engineering and Information Technology, 16(2), 508-516. https://doi.org/10.18517/ijaseit.16.2.21792

Vancouver

Kumala NRD, Mahfuda A. Optimization of Multi-Contractor Housing Development Using Integer Linear Programming. International Journal on Advanced Science, Engineering and Information Technology. 2026;16(2):508-516. doi:10.18517/ijaseit.16.2.21792

BibTeX
@article{Kumala2026,
  author = {Kumala, Nevy Risna Dyah and Mahfuda, Anno},
  title = {Optimization of Multi-Contractor Housing Development Using Integer Linear Programming},
  journal = {International Journal on Advanced Science, Engineering and Information Technology},
  year = {2026},
  volume = {16},
  number = {2},
  pages = {508--516},
  doi = {10.18517/ijaseit.16.2.21792}
}
Kostenlos starten →